Centrio Avenue


Centrio Avenue is a low-medium cost apartment located at Jalan Bukit Gambier, Gelugor, Penang. Centrio Avenue consists of two 31-storey apartment blocks with a total of 780 units. Each apartment unit has three bedrooms and built-up area of 650 sq.ft.

Property Project : Centrio Avenue
Location : Gelugor, Penang
Property Type : Apartment
No. of Blocks : 2
No. of Storey : 31
Total Units : 780
Built-up Area : 650 sq.ft.
Developer : Nuwata Sdn Bhd (Boon Siew Group)

570 comments«Oldest  ‹Older  1 – 200 of 570  Newer›  Newest»

August 16, 2011 at 1:55 PMJc

is it need to apply from jabatan perumahan as well ??

 
August 17, 2011 at 12:52 AMEn Sheng

Jc: You are required to apply from Jabatan perumahan in order to get a unit to buy. The form they selling RM 1.00 ea. Therefore, you just fill in the form and then submit to Jabatan Perumahan.

 
August 17, 2011 at 10:44 AMJc

ths alot, Sheng.

 
August 17, 2011 at 3:50 PMSteve

guys price for this place starts from $118k and above....


the location look good and the view is nice as u get hill view at 1 side and town view at the other side.....

 
August 17, 2011 at 7:26 PMAnonymous

at last some reasonable price house for people like me :)

 
August 17, 2011 at 7:58 PMAnonymous

is this project leasehold or freehold? hw to get more info?

 
August 18, 2011 at 11:49 AMJc

erm..guys, its a walk-in purchase or apply from jabatan perumahan ????

 
August 18, 2011 at 8:13 PMEn Sheng

Steve: Sounds great right? I applied for one unit d.
Peter: This project developer name Nuwata Sdn Bhd (Boon Siew Group)as stated above. Thus, this low-medium cost project is freehold. Need to get more info? visit to Penang, Jalan Bukit Gambier, Gelugor, Penang. There's a show house which I just went there for a couple weeks ago.
JC: As I mentioned bought a form RM1 fill in then submit to Penang Komtar 3d floor. Rumah Daerah please tick as DTL, project name Centrio Avenue.

 
August 18, 2011 at 8:42 PMAnonymous

thanks en sheng .. will do

 
August 19, 2011 at 12:46 AMfantasy

i saw this website http://erumah.penang.gov.my/projekaktif/layoutdetailprojekaktifMain.php?kod=4&&ruj=4033&&nama=CENTRIO%20EVENUE&&OC=2
stated that the cost of the house is RM72,500, how come the price can jump til 118k? I tried to check the room type on www.bsg.com.my but can't find it~ very confused :S

 
August 22, 2011 at 12:48 AMPerakian08

Don't know why they not allow walk-in buyer to enter the show room?

 
August 23, 2011 at 11:38 AMSunnyTCY

Guys, why jabatan perumahan take so long to approve ? i submitted last year.

 
August 24, 2011 at 10:02 AMSteve

STCY: Check ur online status for the aproval as the official letter for the project dint reach many people.

En Sheng: i got my unit already. the unit price was $129K

this project price goes up for every floor that u purchased
the starting price is at $116K for the 6th floor...

Guys if you need more info or help on the pruchasing the unit here u can just drop by at the show room. u guys can even pass the form that u took from Jabatan Perumahan to the People at the Sohw unit for them to help u get the unit.they are open from 9am to 5.30pm monday to friday

 
August 24, 2011 at 11:09 AMxiaofen

can i know where the showroom near by?how much salary needed if want apply this unit?the price goes up for every floor mean the size of the house oso different?expect apply from jabatan perumahan hv any method to buy this unit?

 
August 24, 2011 at 11:21 AMSteve

Xiaofan: the show room is at jalan Bukit Gambir Gelugor, Penang. at the building site as well. ur bacis must not be above 3K to get this unit.

the unit size is the same but the price goes up because of the view that u get when u higher. all the unit is standard 670sf. with 3 room.

Sorry the only way to get his unit is going through Jabatan Perumahan.

 
August 24, 2011 at 12:31 PMxiaofen

steve:easy to find that place? that mean not confirm will get it? I heard hard to apply house from jabatan perumahan

 
August 24, 2011 at 2:42 PMSteve

xiaofen: yes its very easy to find the place as its just at the conner berofe u go up the Jln Bukit Gambir Hill.

if u want to get it u can pass the form that u take from Jabatan Perumahan to the Developer at the Show Room. They'll help u to get it by passing in the form themself.

Yes u can get the form at Jabatan Perumahan Level 3 Komtar. then pass the form to the developer themself....

 
August 24, 2011 at 2:55 PMxiaofen

STEVE:THANKS A LOT :)

 
August 24, 2011 at 3:54 PMTJ

Hi Steve, I've appealed to Jabatan Perumahan by filling in their Pink Form and submitted to them directly. Is there any chance to get a unit without submitting it to the developer?

 
August 24, 2011 at 4:34 PMSteve

TJ; when did u apply?? have u check ur online status??
if u dint get it u can get 1 more pink form and try submitting it to the developer to help u....

 
August 24, 2011 at 4:50 PMTJ

Steve : i applied two weeks ago.
already checked online and still in the waiting list. jabatan perumahan mentioned have to wait for batch 3 ballot drawing to see if got any balance of unit, maybe i should get another form and try my luck. tks anyway

 
August 24, 2011 at 10:50 PMSharon

Hi Steve, thanks for all the infor. Would like to know any boon siew housing in mainland butterworth? preferable seberang perai tengah or utara. i wish i can apply centrio avenue but think it must difficult coz many ppl apply too...
sharon

 
August 24, 2011 at 11:02 PMSharon

Hi Steve, i'm thinking to apply for the medium low cost house.. think its too late already but still trying...thats why i wont apply those in penang island...coz too late alrdy... thanks if u can suggest some nice one in mainland for now. thanks lots

 
August 25, 2011 at 7:58 AMSteve

Sharon; if u want a nice 1 in main land u need to wait till year end as there are many company like Boon Siew that will launch PMC project around there.... u just missed a LMC double story house in Kepala Batas...

anyhow u still can give Centrio a shot... its worth trying...

 
August 25, 2011 at 9:33 AMAnonymous

anyone here actually got a LMC unit applied through Jabatan Perumahan .. how long did it take after submitting yr application?

correct me if i m wrong i heard tat it takes 2-3 years coz of the long queue . thanks

 
August 25, 2011 at 11:15 AMSteve

i dint have to wait that long its actually on how u manage ur monthly expences and how much u earn as ur basic thats counts....

i only waited less then 1 year applied last year and submited the pink form just weeks before this project was launched...
i got a unit in this project....

 
August 25, 2011 at 12:58 PMChuah

Hi Steve,
what u mean by basic must not be above than 3K to get a LMC unit??
For examples if my basic salary is lower than 3K but after plus with OT & allowances is more than 4K, is it still eligible for the requirement to apply a LMC unit???

 
August 25, 2011 at 1:09 PMSteve

Chauh; yes u can get it...

 
August 25, 2011 at 1:26 PMChuah

Hi Steve, thanks for your info.
I will try to get a unit.
Is it directly pass the form to developer have more chances to get a unit?

 
August 25, 2011 at 1:34 PM阿凡

hi all,

fyi, the block 1 (16units) only left 3 units. only block 2 (14units) havent release yet. i still in the waiting list and i had submitted the surat rayuan form (pink color). i got 2 friends get the offer d n hope that we can get it soon. good luck everyone...

 
August 25, 2011 at 5:03 PMAnonymous

steve thanks for the info

good luck to everyone applying for this project

 
August 25, 2011 at 11:09 PMSharon

Thanks Steve....
Sigh.... its really too bad...didnt really know those launching and sometimes didnt know which is best one...
Do u know what project is that? or how will i know any launching from them? if end of this year, is it better to wait until that time only then i apply?
if i apply the centrio avenue now, sure it'll in waiting list dont knw untill when... by the time the new project up in mainland, can i still apply then? thanks lots!
Sharon

 
August 31, 2011 at 11:00 PMRaine

Steve which floor u get?
rm129k only so cheap

 
September 5, 2011 at 7:36 AMSteve

Raine; i got 16th floor...
its already called LMC.... so it has a min and max limit in the amount..

 
September 6, 2011 at 6:33 PMCyndy

hi Steve & Tj & Friends,

May i know how to check my status through online..? kinda new here.. hope you guys can help me. already registered both side but dont know about my status. hope can check online myself.
your help is much appreciated. thanks alot~

Rgds,
Cyndy

 
September 6, 2011 at 10:40 PMBeautiDeBella

6th is the starting floor? rm116k with cement floor? it was little bit expensive d....

 
September 7, 2011 at 4:10 PMRaine

Hi Cyndy,

Go to this goverment website, u will find what u want.
http://erumah.penang.gov.my/

 
September 10, 2011 at 1:08 AM88

停車位、裝修費都算進去,“廉屋貴賣”料難解決.(This news link by sin chew jit poh)

由星洲日報大北馬于 2011年8月15日0:24

發展商申請興建高樓住宅圖測就需列明充足停車位,但發展商是否有權力把停車位、裝修費等包含在屋價內出售,致使“廉屋貴賣”現象永遠無法解決?



7萬2千500令吉中廉價屋原本是解決中低收入群“無殼族”,實現“居者有其屋”目標。但是,申請獲得批准的購屋者近幾年上門向發展商洽詢時,卻需付出超過10萬令吉,才能得到包括停車位和裝修費用在內的單位。



發展商的“技巧性”做法,致使“廉屋貴賣”的情況日趨嚴重,中廉價屋單位的購屋者幾乎沒有選擇權利。因為購屋者不接受發展商獻議的配套,往往就買不到夢想屋。



《大北馬》接到讀者投訴,聲稱一個興建中的中廉價組屋發展計劃出現廉屋貴賣情況。



《大北馬》記者根據讀者提供的資料,在檳州電子房屋網站(http://erumah.penang.gov.my/)查詢時,證實有關計劃是兩幢31層樓高組屋,共有780個面積各為650方尺的3房式單位,所有單位皆分配給中廉價屋申請者。



這名讀者最近通過檳州政府的電子房屋網站,發現自己獲得獻議購買開始興建的中廉價屋發展計劃。



他在互聯網搜查承建商的背景時,獲悉承建商屬於一家信譽可靠的房屋發展集團後,頓時興奮莫名。



可是,他到發展商的陳列室詢問詳情後,實際情況卻是南轅北轍。



他以為自己只需付出7萬2千500令吉就可購下夢寐以求的房屋,但發展商職員表示購屋者需要付出11萬8千令吉或以上才能購屋。



★針對發展商“變相”售賣停車位給購屋者的現象,這名讀者炮轟發展商有義務提供停車位卻售賣給購屋者。



“據我所瞭解,發展商提呈圖測尋求批准時,一定要列出停車位數目,以符合住戶的需求。尤其在土地有限的檳島,一個高密度發展計劃的停車位蹙,當住戶把車輛停放在週圍的道路,將造成交通堵塞。”



因此,他質疑發展商有沒有權力把已在圖測中的停車位,通過另一種方式賣給住戶?



★為了證明讀者的“廉屋貴賣”投訴是否屬實,《大北馬》記者親臨發展商位於甘密山的陳列室,在沒有表露身份下向發展商職員查詢。



記者在陳列室時,也有數名符合資格的申請者上門洽詢。發展商職員向他們表示其公司不像其他發展商“委任”特定裝修商在組屋底樓“擺檔”,反而是直接協助購屋者裝修。



★記者與發展商職員的對話大略內容如下:

記者:請問這項CXXXXXX EXXXXX計劃的屋價是多少?

職員:118千令吉或以上。

記者:為什麼要118千?政府不是規定72千5嗎?

職員:118千令吉包括一個18千500令吉的停車位,以及鋪地磚和裝置窗戶的裝修費。

記者:如果我買一個單位和停車位的話,也不用118千?

職員:你別忘記,七十多千的屋子沒有提供停車位。

記者:我可不可以只給72千500買屋子,加上18千500令吉買停車位,然後自己掏腰包做簡單裝修?

職員:這就必須等你收到我們(發展商)發出的獻議書(offer letter)後才來洽談。

記者:如果我只買屋子和停車位,是不是代表我的單位不會有窗戶呢?

職員:我們可以在你獲得獻議書後再進一步討論。

記者:我可不可以瞭解為何要付118千?

職員:其實,一間中廉價屋單位確實是72千500,但購屋者沒有察覺他們還需要付出更多錢買停車位、裝修、律師費等,這一切往往不是中廉價屋購屋者所能負擔的費用。而且,這筆118千會列入買賣合約內,意即購屋者只需付出10%頭期,其他款項由銀行融資。

記者:這樣的話,律師費也可以被列入貸款?

職員:如果是118千的價錢,律師費由我們負責,其他費用則納入貸款內。

 
September 10, 2011 at 1:11 AM88

熱門地點“廉屋貴賣”嚴重(This news link by sin chew jit poh)

由星洲日報大北馬于 2011年8月19日22:07


發展商使用不少“投機取巧”手段“貴賣”廉屋,尤其在一些能夠售出的策略性地點,發展商暗中完成組屋單位的裝修工程,致使上門的購屋者無從選擇下簽署買賣合約,付出比原價貴了一倍以上的價錢才能買到心頭所好。



儘管檳州秘書署管轄的房屋局經常接到民眾投訴“廉屋貴賣”,也會監督各項中廉價屋發展計劃,但是,發展商同樣有“反擊”對策,最常出現的情況是暗中裝修所有單位,然後以高價出售購屋者。



雖然發展商遭房屋局召見,但發展商聲稱裝修已經完成,甚至已取得入伙准證,他們不可能虧本賣屋,往往令發展商從被動變成主動,形成購屋者任由發展商宰割的情況。



掌管房屋委員會的檳州行政議員黃漢偉接受《大北馬》專訪時說,房屋局很難對已經取得入伙准證的房屋發展計劃採取行動,但是,房屋局官員已經學乖,極力杜絕任何故計重施的機會。



他說,現在的購屋者已經越來越聰明,也擁有一定的基本法律常識。在策略性地點的發展商暗中抬高屋價,是因為他們無需擔心賣不出房子。



“這種現象在東北縣尤為嚴重,西南縣和威省的中廉價屋沒有這個問題。有人指責廉屋貴賣現象近三四年才發生。已經擱置了8年,獲得‘白武士’出手挽救的安寧園中廉價屋發展計劃,當年售屋時已把附加配套強加在屋價裡。”



他補充:“州政府在很多地方建廉屋,卻不是每個地點的廉屋一定賣完。我在6月中拜訪一個位於壟尾的中廉屋發展計劃。這個計劃共有90個讓民眾公開申請,發展商已多次根據州房屋局提供的名單,發出多於單位總數的獻議書給合格申請者,至今還有最少10個單位無人問津。”



他透露,也有發展商在非策略性地點強加額外配套抬高屋價,最終落得屋子賣不出的下場。



“雖然檳島的房屋很搶手,消費者也有很多選擇,他們通常以未來的產業價值作為考量。有些人情願選擇銀行拍賣的二手廉屋,因為價錢隨時比政府規定的最高7萬5千令吉還低,只是需花時間辦理轉名等手續。”



檳州政府的立場很簡單,不允許發展商強加任何附加配套包括停車位、裝修費等在購屋者身上,只允許獻議購屋者購買配套,同時,購屋者有權選擇其購買“空屋”,或者決定接受配套。



黃漢偉說,發展商不可以因為購屋者不願接受附加配套而拒絕售賣屋子。很多購屋廉屋的民眾只是騎摩哆車,根本不需要停車位。



“假設購買廉屋者沒有多餘積蓄,每個月的收入僅僅足以養家餬口,試問他們如何負擔轎車貸款、燃料費、維修費等?而且,有些屋主只是在水泥地面鋪上地席一樣可以入住。”



黃漢偉3年半前接管房屋委員會後,曾召見並盤問4名暗中抬高廉屋價格的發展商。上述4名發展商的資料後來呈交房屋及地方政府部處理。



他說:“發展商執照由房屋部發出,只有後者能對發展商採取行動。在州政府和地方政府方面,我們以拖延發出入伙准證的手法,要求發展商合作,以原價出售廉屋。”



★黃漢偉鼓勵民眾投訴發生廉屋貴賣現象的發展計劃,同時不排除接到投訴後,安排陌生面孔的公務員和親友到陳列室親身瞭解實況。



他說,民眾的投訴十分重要,購屋者必須瞭解本身的基本權利,不要受到別有居心的發展商剝削。



“州政府有義務保護購屋者和低收入群體的權利,不要讓他們成為受害者。發展商的售屋手法也經常改變,我們需要民眾的配合。”



他說,房屋局在申請廉屋的作法比以前更化,包括在電子房屋網站(http://erumah.penang.gov.my/)列出發展商名稱、地點、分配的單位總數等。



不過,他坦言系統的更新速度不理想,最好的方法是合格申請者親自聯絡房屋局查詢。



★針對發展商以地價和建築材料加重成本為由,必須高價售賣廉屋來取得平衡,黃漢偉無法接受這樣的理由。



“由於發展商每增100間非廉屋就必須建30%的廉屋,我們鼓勵發展商以交替補貼(cross subsidy)的作法,把廉屋的建築成本納入高檔房屋售價裡。”



他透露,最近拜訪西南縣一個廉價屋發展計劃時,發展商接受交替補貼的建議,總數80個單位各以原價3萬6千令吉出售。

 
September 10, 2011 at 1:13 AM88

廉屋停車位可不可以賣?看看律師怎麼說……(This new link by sin chew jit poh)

由星洲日報大北馬于 2011年8月16日0:05

廉價及中廉價組屋的停車場到底可不可以賣?



目前檳城的廉價及中廉價組屋內,再也難找到“先到先停”的免費停車位;很多發展商把這些空間規劃出售,因此出現了平均7萬5千令吉的中廉價單位漲至13萬令吉的現象。



姑且不談有些發展商“威逼”獲中廉價屋者購買停車位及提升配套的問題;先談發展商到底有沒有權利出售廉價及中廉價組屋的停車位?



問題出現在政策上。



熟悉房屋法令的執業律師李凱受訪時告訴《大北馬》,房屋發展內容通常分為三大部份,即Parcel(單位)、Accessory Parcel(附屬單位)及 Common Property(公共資產)。



“先到先停”的停車場是公共資產,經規劃後出售的停車位則是附屬單位;前者不可售賣,後者可以,而且買主的分層地契上會有註明他擁有此附屬單位。



李凱說,政府規定發展商,每建100單位廉價組屋,就需提供50個停車位;每建100單位中價屋,就得提供75個停車位。不過,當發展商呈發展圖測時,地方政府只負責鑒定有沒有停車位;不決定該停車位屬於公共資產或附屬單位。



“決定的權力在土地局手上,而且土地局是在發展商申請分層地契時才決定,問題就出現在這里。”



李凱說,土地局和地方政府在這方面的不協調,導致很多高樓管理問題。不只是公寓,商業單位也面對相似問題;不只是停車位,公寓民眾會堂、樓頂空間也出現了被發展商出售或出租的情況。



“甚至出現了某公寓的七百多個停車位,全附屬在一個公寓單位業主名下的問題。為何土地局會批准該業主擁有七百多個停車位?”



★李凱認為,若這些停車位不被允許出售,政府就需立法闡明;其實只要地方政府和土地局協調,也可解決此問題。



“民宅單位的停車位很容易處理,就只分為公共資產和附屬單位兩種。不過,土地局需和地方政府協調,要發展商呈圖測時,先闡明停車位屬於哪一類。”



“或是發展商若不先到土地局進行空間分類,政府就不發入住准證。”



他說,目前的房屋買賣合約內只闡明“圖測已獲准”、“已獲策劃准證”,但並沒有告訴消費者空間的分類。



★李凱呼籲政府學習新加坡的做法,在獲得入伙准證(OC)後,立刻頒發分層地契。



他說,售屋後、申請分層地契時,才來決定哪個空間是單位、附屬單位或公共資產,對消費者不利。



“東西賣了才申請?這是本末倒置的作法。”



“只要建築物建竣,測量師就可鑒定該建築物是否依照圖測;若通過,發展商就可申請分層地契,不需等三、五年或十年。”



據他所知,目前有一些負責任的發展商,在房屋竣建一年內就可以拿到分層地契。



★李凱說,政府要求發展商提早申請分層地契會有個好處,即避免發展商將有關費用“花掉”。



“一些發展商拿了買家的錢,用完後就沒錢申請分層地契,因此拖了很多年。”



他說,雖然法律闡明,若發展商在計劃完工後半年內沒申請分層地契,可被罰款最少1萬令吉,最高10萬令吉;每一天可被罰100令吉至1千令吉。但不嚴厲執行相關法律也沒用。



★李凱說,另一個可能會爆發的房地產問題是商業單位。



房屋部擬定房屋發展法令保護買者,比如合同內硬性規定發展計劃完工後才可以向買者收費、公開售屋前需先獲准證等。



不過,這法令卻沒被使用在商業單位的發展計劃中。



“發展商只需在工地打一枝椿,就可以向買者收錢。”



李凱認為房屋部需要疑定法令來控制商業單位的發展計劃,保護消費者。



“去年房屋部說要到各州巡迴聽取民意,我一直在等,但他們還沒有來。”



相關新聞:停車位、裝修費等算進屋價‧“廉屋貴賣”沒完沒了!

 
September 10, 2011 at 1:16 AM88

〈大北馬〉記者評論─筆筆皆是:房事,煩……(This news link by sin chew jit poh)

由星洲日報大北馬于 2011年8月20日22:51

8月16日,《大北馬》封面報道了一家房屋發展商擅自抬高中廉價屋價格,從政府規定的7萬2千500令吉提升到11萬8千令吉。當然,近12萬的售價也包括裝修費和停車位。



據說,報道引起了檳州政府高度關注,後來還召見了發展商高層,斥對方必須讓購屋者自行決定是否接受配套,同時禁止發展商把屋價強加停車位和裝修費,使得一些早有打算的合格申請者無從選擇。



一名騎摩哆車的合格申請者,月入是2千令吉,也決定一輩子不婚,更不要被汽車貸款約束,試問,他需要停車位嗎?



一對每月總收入只有2千500令吉左右的夫妻,男屋主有一輛轎車,女屋主是家庭主婦。兩人的積蓄介於3萬令吉左右,原本只打算挪出積蓄付頭期,再做些簡單裝修,購買家私與電器後,其他向銀行貸款就入住新居,再慢慢攤還房屋貸款。試問,他們需要付出12萬購買屋子和停車位嗎?



還有一名性格特別的合格申請者,他情願在屋裡鋪地席,再加張睡床、幾百令吉的沙發,還有簡單電器就直接搬進新家。這名申請者有一輛汽車,但他覺得天天接警察傳票也沒關係,反正就是不讓發展商賺取一筆買停車位的錢。試問,這名申請者需要買停車位和讓發展商負責裝修嗎?



前天,讀者向《大北馬》反映發展商“出爾反爾”,告知發展商職員聯絡合格申請者,告訴他們必須在7天內交出1萬2千令吉頭期,發展商也不會發出獻議書給申請者。倘若7天後還沒收到1萬2千令吉,發展商就會取消合格申請者的購屋權。



天啊……這是什麼歪理?人民竟然沒有權力決定是否購買屋子,反而是由發展商主宰人民的命運?



如果合格申請者可以購買空屋,意即只需付出7千250令吉頭期。發展商現在索價1萬2千,一個單位要賣多少錢,相信大家一看就明。



地方政府通過高樓住宅的圖測前,一定以發展商是否規劃充足停車位來決定。這也意即發展商從一開始就有義務設立停車位給居民。但屋子建好後,或者屋子還在大興土木時,發展商有沒有權力把停車位賣給購屋者,那可是一個大大的問號。



根據法律界人士說法,發展商提呈圖測時,需列明公共資產和附屬單位種類的停車位,然後在土地局批准下,出售屬於附屬單位的停車位。但是,分層地契未發出前,發展商無需在房屋買賣合約列出空間分類,加上地方政府與土地局缺乏協調,使得發展商有機會與購屋者爭辯停車位的售賣權。



在高樓住宅密集的檳州,存在很多煩人的“房事”,追根究底還是與政府的立法有關。房屋發展法令、分層地契法令,還有4年前執行的建築物及產業聯合管理法令都充滿漏洞,導致購屋者一再地被發展商剝削。



檳州政府也鼓勵面對“廉屋貴賣”的公眾上門投訴,揭露發展商的所作所為,以免更多無辜購屋者在無從選擇下成為受害者,被迫簽下與原價不符的房屋買賣合約。



還有,講了很多年的強制性“先建後售”一天未落實,購屋者的權益就永遠得不到保障。尤其出現“廉屋貴賣”,造成低收入群體望屋興嘆,投訴無門的情形時,發展商高喊不夠現錢建屋的“苦衷”,又有誰會起“憐憫”之心呢?

 
September 10, 2011 at 1:19 AM88

大北馬〉記者評論─筆筆皆是:致林冠英公開信(This news link by sin chew jit poh)

由星洲日報大北馬于 2011年9月3日22:15

尊貴的檳州首席部長林冠英先生:


事先聲明,草民致函給尊貴的您,只是希望“貓政府”落實真正的“以民為本”政策。



事關民聯執政了檳州三年半,在這些日子裡,州政府還未展開具體的大型發展計劃,但州政府推出的一些政策,確實對檳州的未來影響深遠,也得到大部份人民的認同。



檳州人民在308大選以選票宣洩對國陣的不滿情緒,也讓您在毫無心理準備下當上檳州首席部長,為民主行動黨、人民公正黨和回教黨寫下歷史。



撇開行動黨和公正黨對議席的你爭我奪不談,畢竟那是兩黨的私事,即使你們爭到頭破血流,也不會影響人民的作息。反之,你們繼續鬥爭下去,說不定引發人民的反感,就像三年半前人民對國陣的態度一樣。



說回人民的問題,在國家房屋政策下,那些興建窮人望塵莫及房屋的發展商,都必須興建廉價屋和中廉價屋給窮人,實現“居者有其屋”目標。



事關一家發展商最近被揭發以11萬8千配套售賣原價7萬5千的中廉價屋,配套包括停車位和裝修費,至於角間單位索價13萬,而且,售賣房屋的發展商職員還聲稱單位所剩無幾,導致購屋者無從選擇。



好奇的是,雖然州政府已接到這起事件的投訴,但仍未對發展商有所行動。購屋者更難受的是,州政府原本應該協助他們解決問題,如何反而被要求自行聯絡發展商高層職員,這難免會引起推卸責任之嫌。



難道州政府任由不守規則的發展商搾取購屋者,而且幾乎都是低收入者?現在,很多購屋者已經簽下至少11萬8千的房屋配套,也無奈地付出了1萬2千的頭期。因為發展商職員致電告知,若他們不在7天內交出頭期錢,就取消他們的購屋資格。



法律不是規定14天嗎?獲批准的申請者不是有14天的時間做決定嗎?怎麼現在變成好像是購屋者向發展商“乞討”房子呢?州政府還把發出獻議書的責任交給發展商,致使購屋者的命運被發展商左右。



雖然州政府已對廉屋貴賣課題作出解釋,但任何解釋充其量只是“打官腔”。尤其新聞刊登在報章,發展商仍舊故我,對急於尋找一瓦遮頂的購屋者,面對壓迫只能忍氣吞聲,心不甘,情不願簽下並非他們所要的配套。



更令草民傷心的是,州內反對黨對廉屋貴賣的情況也置之不理,平時見他們挺胸插腰以檳州人民的身份質問尊貴的您,至今卻沒有任何反對黨協調員,站出來為購屋者講幾句公道話。



看來看去,現在,只剩下尊貴的您可發揮首席部長的權威,履行您曾許下“不怕得罪任何人”的承諾幫助購屋者。如果您坐視不理,不排除未來會有更多的發展商有樣學樣,想盡方法宰割原本就缺乏能力買房子的窮人。



草民也難以想像大選投票時,這些被逼廉屋貴買的購屋者,會不會像上次一樣,把不滿的情緒和心中的怨氣發洩在選票上?



一個關心人民的草民 敬上

 
September 12, 2011 at 2:14 PMTJ

Anyone knows what's about the above Sin Chew Jit Poh news?

 
September 13, 2011 at 4:05 PMRoman

Hi, My sister and her boy friend received letters from developer which asking them to choose their unit...i think after they select the unit, they will have to pay the RM12k as deposit right? Any facilities for this LMC apartment? and what's the maintenance fee?

 
September 13, 2011 at 4:14 PMRoman

Hi TJ,

The news are about why developer is selling LMC apartment as high as RM118k or RM130k (corner unit), instead of the suggested RM72.5k by the government. Developer was claiming that RM72.5k doesn't include one parking lot, floor tiles and legal fees. Besides, Justic Pao pasted an open letter from a Penangsite to CM which requesting the Penang CM to help those low income group to discuss the selling price of the LMC apartment with the developer.

 
September 13, 2011 at 5:42 PMTJ

Thank Roman. The facilities are Security, Gym, BBQ pit, Playground and Park. The maintenance fee is about RM100 plus minus ....

 
September 13, 2011 at 7:01 PMRaine

Hi guys,
My friend called to ask regarding the upgrading package. They said it is optional.
Dunno true or not?? so confused

 
September 14, 2011 at 2:04 AM88

Hi,Raine,
upgrading package is optional,if developer to want sales 120-130k about this unit,u can report to penang state goverment.(komtar 28 floor)CM Office.

 
September 14, 2011 at 11:56 AMRoman

Thanks TJ. Hope my sister manage to secure a unit so that my family can move in together with her.

 
September 25, 2011 at 3:12 PMFong

May i know how much down payment for low-medium cost house ?

 
September 27, 2011 at 12:24 AM88

Down payment RM7250,any wrong down payment,pls report to penang state goverment.

 
September 27, 2011 at 4:57 PMSteve

RM7250 is without car park and renovations...
the price with car park and renovations is RM116K.
i have tried to complain to the State Goverment but the Price which Goverment set is said to be without car park and renovation as what they told me at the Goverment dept.
and the package of car park and renovation is a compalsry as this building has a standart renovation rules that need to be followed.

 
September 29, 2011 at 11:22 PMLovely bear

Still hav any unit left? I wanna book a unit?

 
October 11, 2011 at 2:06 PMcmm

Any new project coming for the medium cost house in Penang?

 
October 19, 2011 at 10:59 PMWinnie

http://erumah.penang.gov.my/projekaktif/layoutSenProjekAktif.php

 
October 19, 2011 at 11:00 PMWinnie

no more unit for Centrio Avenue

 
October 19, 2011 at 11:03 PMWinnie

Car park worth 18K and renovation abt 30k its

 
October 24, 2011 at 2:39 PMJamie Ooi

Where to get the floor plan?

 
October 27, 2011 at 11:18 PMWinnie

law firm

 
November 10, 2011 at 8:55 AMMs Ng

Steve,
You are wrong, the staff told me you can buy at RM 72500 but provided you choose for Level 14 & 31. You c what the staff said all hanky panky and turn here and there like a story teller and try to sell at higher price .If for those not insist to complain to the state they will continue proceed with it.Fight for your right.

 
November 11, 2011 at 12:57 PMSteve

hi ms.ng;
yesi know that but the unit there are alittle different then the other unit as there are water tanks in the floors.....
but up to now there is no other units left as they have sold all the units....

 
November 14, 2011 at 12:17 AMWinnie

steve....u r right....all unit are sold...worth to buy with upgraded unit

 
November 15, 2011 at 2:46 PMLucas

hi all,
i alrd received the goverment pass letter,but izzit i stil need to wait the pink form or i should go 2 take from komtar?

 
November 15, 2011 at 5:43 PMcmm

The pink form have to get it from komtar....
Just write which project you want and submit....

 
November 17, 2011 at 11:55 AMLucas

thanks cmm,
but i alrd submit the white form b4 n then the goverment oso alrd approved,now i received the approved letter alrd,then wat should i do for now?or juz waiting for any letter?
Atually wat is the step if want to buy tis house?
1.take the white form and fill it.(done)
2.after fill it pass to BSG Property.(done)
3....?(not yet)
4....?(not yet)
5...?(not yet)

 
November 17, 2011 at 1:54 PMcmm

Wait for BSG Property letter. If they still have the unit then u will get the letter...

 
November 18, 2011 at 9:36 AMLucas

oh i see,thanks a lot for inform cmm,thanks...

 
November 22, 2011 at 8:54 PMfreestyler - michelle

May I know are there any units left for purchase?
I am very interested...

 
December 29, 2011 at 6:45 PMWinnie

So far in gov postal....there is no more unit left.... and the confirm buyer cant sell the house within 5 years....

 
December 29, 2011 at 6:49 PMWinnie

Lucas,

Once you received approval letter from gov (in waiting list) u may look for other project at http://erumah.penang.gov.my/projekaktif/layoutSenProjekAktif.php for any project that u interested. and then fill in the pink form at komtar and indicate the project name on the form....

 
January 13, 2012 at 10:12 AMLucas

thx LSE...
izzit u means i need go to komtar again for fill the pink form at there?or take back n fill it?actually im very need this house,thx alot LSE...i hope im the one from they choose...

 
January 14, 2012 at 6:58 PM88

你有權不買配套 屋高過頂價發展商有難
(china press 9.1.2012)

(檳城9日訊)檳州房屋委員會主席黃漢偉向購屋者派定心丸,可拒絕發展商提出的“房屋配套”,也不必擔心向房屋局投訴后,會失去獲分配中廉價屋單的名額。

 “畢竟投訴者必須是已獲得州政府,發出中廉價屋的認購批准信”。”

 他接受《中國報》專訪時指出,檳房屋局平均一年介入數十宗,檳島中廉價屋“高過原價”的投訴個案。

 他說,一旦接獲投訴,房屋部將警告發展商,並向負責控制發展商執照的房屋與地方政府部,以延遲發出住用證。

 詢及有多少發展商曾被對付時,他說,該局以單宗個案處理,未細算被對付的發展商數量。

 “相較勒令發展商停工,延遲發住用證是一種恰到好處又奏效的施壓方式,減少對其他購屋者的影響。”

 近年來檳島屋價高企不下,許多購屋者投訴原價7萬5000令吉的中廉價屋單位,經過“房屋配套”后飆漲至13萬令吉至18萬令吉。

 由于擔心失去分配額,許多購屋者無奈接受發展商提出的“房屋配套”並不曉得原來他們有拒絕的權利。

 對此,黃漢偉說,購屋者一旦投訴后,必須跟進及堅持本身意願,以達到自己最初的投訴目的。

 他坦言,屋價被提高的原因主要是,發展商隨意征收裝修及泊車位費用。

 “發展商有時錯誤估計建築成本,為了減低虧損,可獻議購屋者購買泊車位等其他合理配套,但不應強制要求購屋者接受。”

 他說,州政府會對投訴個案進行研究,看發展商提高價格或提供加錢配套(如裝修及泊車位)的原因。

陳福星:應調高頂價至15萬

馬來西亞房地產發展商會檳州分會主席拿督陳福星認為,政府應調高中廉價房屋頂價至15萬令吉。

 他接受本報電訪時說,檳城中廉價屋頂價是7萬2500令吉,但土地價格、建材成本增加,一間650平方公尺的中廉價屋,頂價應是15萬令吉左右。

 他指出,檳城中廉價屋早在10年前,就出現屋價被提高的現象。

 “為了承擔額外費用,發展商唯有增加裝修配套、泊車位配套給購屋者。”

 他說,該會曾數度擬信給前朝政府、檳州首席部長林冠英及檳州房屋委員會主席黃漢偉,建議州政府提高中廉價房屋頂價,照顧消費者及發展商雙邊利益,避免引來不必要爭端,惟至今沒任何進展。

依種類闊度區域定價

黃漢偉說,州政府有制定廉價及中廉價屋頂價,所有房屋頂價依據房屋種類、房屋闊度及發展區域制定。

 他說,相較東北縣,威省地區較少房價被調高的投訴。

 “州政府曾和發展商會面,告知相關頂價及規定的條例。”

多數人不抗拒買車位

陳福星說,購屋者有權利決定是否購買中廉價屋配套,發展商不可勉強。

 “不過,一般上購屋者不會抗拒泊車位配套,畢竟泊車位已是一般需求。”

 他說,檳城中廉價屋房價調高現象到處可見,尤其市區熱門地帶,就算是二手中廉價屋,價格也有起無落。

 “這是一個反射性現象,成本提高,產品售價自然更高。”

小貼士 

※任何書面投訴可寄Pengarah Perumahan,Tingkat 20,Komtar,10000 Pulau Pinang
TELEFON :04-6505240(pengarah)
04-2621957(norma line)
NO.FAKSIMILI :04-262 2904

※副本則寄YB Wong Hon Wai,Tingkat 53,Komtar,10000 Pulau Pinang。
Tel: 04-6505138
04-2610763
Fax: 04-2618704
h/P:016-4006821(yb wong hon wai)

 
January 16, 2012 at 10:51 PMWinnie

Hi Lucas...

I think all e unit for this project are sold.... if you see any other project that u like....u can go to komtar to get the pink form and u can fill in there if u know the project name...and immediately submit the form....

 
January 16, 2012 at 10:53 PMWinnie

hi Lucas,


for ur info...there are 98 units left...http://erumah.penang.gov.my/projekaktif/layoutdetailprojekaktifMain.php?kod=4&&ruj=4033&&nama=CENTRIO%20EVENUE&&OC=2 u can gor directly to komtar and fill in the pink form and submit it immediately.......may be we can become neighbour....good luck to u

 
January 18, 2012 at 10:06 AMLucas

hi LSE

Thank you very much LSE,i wil go 2 fill the pink form at tis few day.Whatever thanks a lot for ur inform here n hope we really can be a neighbour for future...thanks!!!

 
January 21, 2012 at 1:09 AMWinnie

Hi Lucas...

Good Luck to u

 
January 24, 2012 at 11:52 PM$♄ℯґnn¥

hai all, izit this building will sell more than the price goverment gave us? eg. Above RM72.5k??

 
January 25, 2012 at 7:52 AMcmm

yes..... started from 116K...

 
January 31, 2012 at 11:06 PMWinnie

It was higher because it was upgraded plan...including indoor carpark, fully tiles, aluminium sliding window....etc

 
February 3, 2012 at 11:10 AMmico8286

In Form PN2, the section of SAKSI need to give who chop & sign? Isn't PJK,MCA &etc. person??

 
February 24, 2012 at 10:16 PMTony

I just submitted the pink form on today afternoon,and I heard phase 2 is on the way coming soon

 
February 28, 2012 at 10:31 AMEvalulu

@mico8286

That you can ask for and EXCO member, like those YB to sign for you. Just go to their service centers.

@Tony, I also submitted pink form on 23 February 2012.. hope to be neighbour ya XD

 
February 29, 2012 at 1:50 PMLynn

Hi LSE, I intend to try my luck for centrio evenue and i knew it left only 98 units. I have a few question here...

- I don't think I'm qualified base on the application requirement posted at erumah website... Perhaps can I apply using my brother name together with my mother as he is single?

- For qualified applicant, it is based on computer balloting right? What is the chances?

- Is there other way to apply other than filling up the form at Komtar? FYI, I'm stationed oversea and seldom back to Pg.

- Is there applucation due date for this project?



Penanger
Lynn

 
March 7, 2012 at 10:18 PMyan

hei guys,am had submitted my pink form last yr august,am checked online yet am in a WAITING LIST still. what should i do? am interested dis project. need some opinion n helps. manay thans

 
March 12, 2012 at 8:12 PMJOYCE LSC

Hi peeps ,i just wanted to submit form. will it be too late ?
thanks

 
March 15, 2012 at 9:57 AMEvalulu

By the way, my other friend who submitted application together with me already got the approval letter last week. I wonder how the assessment works in the department? I even submitted pink form in Feb. Perhaps my application has been declined? haha

 
March 19, 2012 at 11:16 PMWinnie

Hi Lynn,

I think its too late to submit the application form...firstly u have to submit the form and get approval from Gov and under waiting list...when u get reply from gov under status approved you can view gov website for oncoming project. http://erumah.penang.gov.my/projekaktif/layoutSenProjekAktif.php...

my application approved in 2007 and when i know Boon Siew is going to hv this project....i go directly to boon siew and show them my approval letter and they will submit to gov ....

I dun think there is other way for application other than submitting the form to komtar...

there is no due date for the project but depends on the accepted buyer....there is still 98 units for tower 1 and tower 2 is coming....total unit is 780.

 
March 19, 2012 at 11:17 PMWinnie

hi yan.... u can go to boon siew office and brong along your approval letter from MPPP and check with them

 
March 19, 2012 at 11:18 PMWinnie

hi foreveralone....


u must get your approval letter 1st before you can submit the pink form....

 
March 20, 2012 at 8:50 PMVenus Wan

Dear LSE, i have few questions.

1) my application approved in 2007 and when i know Boon Siew is going to hv this project....i go directly to boon siew and show them my approval letter and they will submit to gov .... I'm in waiting list. How long u wait to get this appartment? Is it must need to submit approval letter?

2) Let say i do not receive approval letter am i qualify to get one unit of apartment? in waiting list since jan 2012..

3) Is it compulsory to fill in pink form? Coz i'm not around Pg for this few months. My friend she said unless reject the offer from government then only need to fill in pink form.

4) Lastly, how to get approval letter even though already in approval status.

5) LSE: there is no due date for the project but depends on the accepted buyer....there is still 98 units for tower 1 and tower 2 is coming....total unit is 780.
May i know tower 2 have many units?

Thanks LSE post. As u help us alot.

 
March 21, 2012 at 11:34 AMWinnie

Dear Venus,

Ans 1 : When u apply for Gov house u need to fill in the form and submit to komtar. Then Gov will send u a letter indicate ur application is approved or reject. I think i wait for 1 or 2 months. U may check online http://erumah.penang.gov.my/index.php

if your name have been approved the system will allow u to login with ur ic no.

Ans 2: if ur name in website above indicate under waiting list. u r eligible to apply for centrio avenue project. if ur name not in the website....u may go n check at komtar whether they received ur application form.

Ans 3: if ur name is under waiting list u can fill up the pink form for any project the u like to apply eg: centrio avenue
u can check this website for active project http://erumah.penang.gov.my/projekaktif/layoutSenProjekAktif.php

Ans 4 : what i mean approval letter is the letter that gov post to u indicate ur application is approved.

Ans 5 : total unit for 2 tower is 780 unit. im not sure how many unit for tower 1 and tower 2.

thanks and hope this can help u..

 
March 21, 2012 at 11:35 AMWinnie

Dear Venus,
If ur name are under waiting list. U can go directly to komtar and fill in the pink form and indicate the project name that u would like to apply.....

 
March 22, 2012 at 7:00 PMVenus Wan

Dear LSE,

thanks for answer my questions. Do help alot.

ya, is it fill in the pink form will increase the chances to get the project that i interested?

Btw, you bought which level? when you can move in?

thanks.

 
March 27, 2012 at 3:43 PMWinnie

Dear Venus,

The chances may be higher....
I bought level 8 tower 1 and the completion year is 2013 dunno when can i move in....

 
March 28, 2012 at 6:55 AMVenus Wan

Dear LSE,

Ic. Thanks for your info.

By the way, i just receive the approval letter yesterday.

I wish also can get a unit there.

Nice to meet you~

 
March 28, 2012 at 10:39 AMWinnie

Dear Venus,

Congrats to u first for the approval letter ...actually u can try to ask boon siew for the Centrio Avenue project cos this is their project and at the same time u can fill up the pink form at komtar.

Proviously i go directly to boon siew office....

Hope we can be neighbour....

u r welcome....i do nothing just to share the process that i go through....

 
March 28, 2012 at 8:29 PMVenus Wan

Dear LSE,

Ya,good suggestion.

I'll ask boon siew group by tomorrow.

Hoping we can be neighbour.

Ya, once approve how much you paid?

 
March 29, 2012 at 2:37 PMOPATEfm - other projects are too expensive for me

Hi all,

I'm also hoping to get a unit here. Been in the wait list for almost a year now.

Called Boon Siew, but they say I must wait for our jabatan perumahan allocation.

So LSE,
Did you approach Boon Siew directly? If so, how?
If not, u must have went thru Jabatan Perumahan? How long did u have to wait? I mean how long after you registered your name in their database?

Good luck everyone

 
March 29, 2012 at 8:21 PMIdees-CheeSheng

Hi All,
anyone has any idea when Tower 2 will be launched?

 
March 30, 2012 at 5:15 PMchunyiun

Hi LSE

Completion for Tower 1 in 2013? Dats good news..How's the construction progress so far?

I have a unit there too..=)

 
April 2, 2012 at 2:56 PMNat

Hi! i wanted to apply Centrio Avenue too. but still headache with the signature by Witness.

Evalulu: as you said look for those YB, they will sign for us easily?

Thank you so much:)

 
April 2, 2012 at 5:04 PMOPATEfm - other projects are too expensive for me

Nat,

YBs are not always around. Politicians mah. If the YB is around & agrees to sign on the spot, then that's great. If not, leave your documents with the desk staff & ask him/her when u can expect to get it back. Return to collect it on that day. Sometimes it takes 2-3 days. Sometimes it takes 2-3 weeks.

Another alternative is through lawyers. If you have a lawyer friend or contact, just get a favor from that lawyer.

That far I know. Good luck.

 
April 2, 2012 at 5:18 PMewelee

as this is a low medium cost flat, why we need to pay for carpark & renovation cost? why those flats has to comes with no floor finishes?

 
April 2, 2012 at 6:08 PMWinnie

Hi venus,

once apporved...we need to pay 10% for downpayment and other depends on bank loan...


OPATEfm - other projects are too expensive for me,

last year i approached boon siew and my letter approved in year 2007 it means i hv been in waiting list for 4 years.

Idees-CheeSheng,

Not sure when the tower 2 will be launch

chunyiun ,

so far i know is the construction already at level 3 housing....

ewelee,

Its a upgraded building....its come with floor, toilet and kitchen tiles, covered carpark, solid wood main door and aluminium sliding window. if its not upgraded u need to hv cash to do ur own renovation.

 
April 2, 2012 at 8:24 PMVenus Wan

Dear LSE,

Thanks..

 
April 2, 2012 at 10:15 PMAlise

Boon Siew property asked to wait for the Jabatan Perumahan. Jabatan Perumahan said that Boon Siew property has put the sale on hold.
Looks like they are playing 'tai chee'. It's not fair to applications !!!

 
April 2, 2012 at 11:18 PMNat

OPATEfm: Thanks a lot for your information:) i will try to get a lawyer's signature:) easier than YB's. haha.
Thanks ya:)

 
April 3, 2012 at 2:48 PMWinnie

Actually when i approach Boon Siew, They also need to submit my application to gov for approval...Boon Siew cant make decision as this is consider Gov flat although it was under their project.

 
April 8, 2012 at 11:22 PMVenus Wan

Dear LSE,

How much the monthly loan have to pay?

 
April 8, 2012 at 11:25 PMVenus Wan

Dear LSE,

I just got a unit.

 
April 10, 2012 at 12:37 AMWinnie

Hi venus,

Congrats to u...i pay abt RM500++....which unit u get....tower 1 or tower 2?

 
April 10, 2012 at 12:44 AMWinnie

Hi chunyuin,


which unit u get....will u be staying there after completion?

 
April 10, 2012 at 6:32 PMNat

I already submitted my form last Thursday..now is under waiting list....
Is it a low percentage to get....?

 
April 10, 2012 at 10:38 PMVenus Wan

Dear LSE,

I get tower 2.

ya, mine also around RM500.

 
April 10, 2012 at 11:50 PMWinnie

hi venus,

which unit u get...how can i keep in touch with u other than this blog??

 
April 11, 2012 at 12:27 AMDL

Dear Venus,

How u apply? Walk in to BSG?
Im in d waiting since Sep'11, but haven't received approval letter...

 
April 11, 2012 at 9:09 AMNat

Hey guys, do you all know when will the showhouse reopen? from the BSG staff it will be in next month...

 
April 11, 2012 at 1:11 PMVenus Wan

Dear winnie,

Do know which unit yet. Cos that day i call BSG, they said the ballot will draw around July or August.

U might add me in facebook. Search for "Venus Kien".

 
April 11, 2012 at 1:16 PMVenus Wan

Dear DL,

I applied from Jabatan Perumahan (submitted on oct 2011).

Never approach to BSG.

My approval status is updated in erumah.penang.gov.my on 5 Jan 2012.

However, the approval letter just receive on 25 March 2012.

U may check ur status at erumah.penang.gov.my

 
April 12, 2012 at 1:11 PMWinnie

Hi venus,

Cant get ur name in fb...mine is winnie low (with stop lynas save malaysia photo....

 
April 12, 2012 at 3:48 PMDL

Dear Venus,

My status shows that im in waiting list.
I called Perumahan and they keep saying project on hold.
Guess just have to keep waiting.

 
April 12, 2012 at 8:42 PMVenus Wan

Dear DL,

The Tower hv over 300 units.

What u hv to do is patiently wait and check ur status from time to time.

Wait for the coming ballot draw.

Wish u can get a unit there.

Good Luck ya..

 
April 16, 2012 at 1:49 PMchunyiun

Hi LSE,

Mine is in Tower 1 (should be same as yours) but on level 29...when i went to choose mostly taken up ady..

Most prob will be staying..but too early to decide..:)

 
April 30, 2012 at 4:59 PMPenagites

How u guys managed to get the unit..in fact u must hav less than Rm 1500 monthly family income to obtain..

 
April 30, 2012 at 5:00 PMPenagites

Hoe u guys applied to perumahan..mothly income must be lower than RM1500 to apply!!

 
May 1, 2012 at 11:53 AMVenus Wan

Happy Labor Day~

 
May 8, 2012 at 10:49 AMEvalulu

Hi Venus Wan

I hoped to get a unit for Centrio Avenue too, but thou I submitted my application a month earlier than yours (Sept 2011), I still did not receive any letter from the Perumahan. I also submitted pink form 2 months ago through Komtar counter. Didn't approach BSG. Online status showing I'm in 'Senarai Menunggu', but it kind of stuck there since Oct 2011, if I remember it correctly.

Do you have any idea on what basis they are sending out approvals? Whether marriadge status or salary or tanggungan are involved into considerations when they assessed my submission and pink form? Has the project really been put on hold? I just need to have a rough idea whether I should continue waiting or just buy a cheap cheap second hand apartment :S Really hope to stay in some place new and affordable thou.

 
May 8, 2012 at 11:53 AMWinnie

Hi Penagites,

FYI....ur salary must not over RM1500 for low cost house and RM2500 for medium cost house.

Hi ForeverAlone,

There is no requirement to get a unit in this project....just depends on luck to get any gov house...or else you can select other project on gov website....you must know that once you buy cheap cheap second hand house 1st then ur application in gov system will be canceled and then you are not eligible to get any gov house anymore....my application in perumahan approved in 2007 and i have been waiting for 4 years to get a unit...be patience

 
May 9, 2012 at 3:51 PMEvalulu

Hi Winnie

Thank you for your info. By the way I dropped by BSG office nearby Penang road and a pretty lady there told me that Tower 1 has been sold out, Tower 2 is not yet opened for sales yet. Probably this year end or beginning of next year will open.

.. So... I probably will continue waiting ~.~

 
May 9, 2012 at 5:51 PMWinnie

hi ForeverAlone ,

u r welcome....ya...tower one is sold out cos alot of ppl like the location....

no harm waiting....cos i also wait for 4 year to get my own house....

good luck to u....

 
May 18, 2012 at 8:11 PMdavidlim2012

it totally not fair to me..i have make a lot of complain but it not work.
actually i have check through e perumahan website since AUG 2011 .
i success to get the offer but the developer keep ask me wait for letter until sep 2011 i go to site.the developer say : we sold out
then ask me to wait for second tower.
the thing make me feel unfair is.i'm the one never get the letter until NOW.is the developer purposely delaying me..

 
May 22, 2012 at 10:45 PMVenus Wan

Hi david, do u ever try to submit de print out copy from erumah? May b can try to get de confirmation approval from komtar & get verify from de pengarah.

 
May 22, 2012 at 10:50 PMVenus Wan

Hi foreveralone. Tat day I called the guy who told me the ballot will b on tis coming july.. Wish u can get a unit there.. By de way, there is new project in seri tanjung.. However, awhich is not included renovation & gym room & park.. Free car park.. U may hv a try.. Only RM 72500..

 
May 24, 2012 at 6:25 PMUnknown

anyone have the apartment layout plan can share? By the way, I had applied the BSG and still in the waiting list as checked thru online,

1. will i able to buy the unit? Any advice?

2. Currently i am staying with my parent and they would like to change the house under my name, am I still qualify for the application low medium cost house?

Please email me if possible @ chtan1907@yahoo.com.sg

Thanks and Best Regards,
Ryan Tan

 
May 25, 2012 at 1:03 PMUnknown

Can I use my EPF for the downpayment?

 
June 16, 2012 at 3:11 PMUnknown

haiz, i have submited the letter since begin of 2011, still pending in Erumah, anyone have any idea when towel 2 will launch?

 
June 26, 2012 at 10:30 AMNat

I am waiting the ballot draw in coming July..don't know it will be which date...really excited!

 
June 26, 2012 at 9:57 PMUnknown

Nat,

confirm will draw the 2nd phase in July 2012? Get confirm from Government or BSG?

 
July 9, 2012 at 9:58 AMEvalulu

Hi Guys,

I heard a sad rumour and would like to ask you guys whether this is actually happening in our local government or not.

I heard some rich people who wants to buy cheap houses for their foreign workers actually pay young people or those who do not have a house to apply low cost house. These rich people then pay around RM15~20k to developer to submit the application and the application will definitely be approved.

Anybody heard this rumour before? Is this true?

 
July 10, 2012 at 10:37 PMZENTO+

Hi All, if my status in erumah penang "DALAM PROSES TAWARAN (BERJAYA" is it i am qualified already to apply apply this project?? Anyone in same situation?? Thanks All :D

 
July 11, 2012 at 6:04 PMNat

Zento,

So do you know which project you get?

Unknown,

I'm not sure also.

 
July 16, 2012 at 1:59 AMWinnie

Hi Zento...


yeah...its means u hv successful get a unit for the project indicate in the system....

 
July 17, 2012 at 5:55 PMmeileng

sorry it just too long to tread all the information you guys given. May i ask again is this Centrio Avenue (freehold), (got facilities??) if yes what kind of facilities they given??? TKVM for answering n sorry for trouble

 
August 21, 2012 at 4:03 PMUnknown

after fill in the form from jabatan perumahan, who to invite to chop sign at the back?

 
August 27, 2012 at 10:24 AMEvalulu

Bilangan Unit :414
Terima Tawaran :316
Dalam Proses Tawaran :98
Baki Unit : 0

I guess no luck for me.

 
October 4, 2012 at 3:58 PMCMC

Dear all,
I submitted the white application form in August 2012. Now I am in the senarai menunggu when checked online....What must I do now in this stage? What is the next thing I have to be waiting for? TQ!

 
December 8, 2012 at 5:44 PMcanny

I summit on June 2011..until now no respond ..any effect if i change new evironment ??

 
December 8, 2012 at 5:47 PMcanny

When i summit that time my salary was Rm800..now change environment to be banker my salary incerease Rm1700..so any effect reject my application ??
Any one pls tell me ..i need a homes ...

 
December 12, 2012 at 3:19 AMImanKhalida

I got a unit and I'm having problems with the lawyer, Ong & associates. Anyone else having the same problem?

 
January 24, 2013 at 1:22 PMUnknown

Hi...May I know normally it take how many day to approve if we aldy fill in the pink form?
I had filled in the pink form and submitted to MPPP during July 2012. Also, I did went to Boon Siew Office to fill again the pink form.
Hope that still have unit left for me since the construction is near the end d.

 
January 24, 2013 at 3:28 PMMichael

how to get nuwata apartment??

 
March 4, 2013 at 8:46 PMdoozer

Hi Michael,

This is LMC apartment, if you want to apply LMC, u need to fill in and submit the form at Komtar.

 
March 4, 2013 at 8:50 PMdoozer

Hi Chuan ins,

Cant really tell you how long it takes to get approved. i submit 3 times as well. Some wait for few years only can get. Depends on your luck. Try your best to resubmit pink form once u free. Percentage to get may b higher. this is just my opinion.

 
March 4, 2013 at 8:51 PMdoozer

Hi Canny,
It wont affect you to get your dream house. The requirement based on the time you submitted your form. Meaning based on salary rm800. Good luck

 
March 4, 2013 at 8:52 PMdoozer

Hi CMC,

Have you fill in the pink form?

 
March 4, 2013 at 8:54 PMdoozer

MeiLeng,

Yes. Free hold. Facilities include gym, garden, bbq area, play ground & security access. This is medium low cost so there is no swimming pool.

 
March 11, 2013 at 10:41 AMAshlyn

Is this still available to apply?

 
March 12, 2013 at 9:26 AMdoozer

Hi Ashlyn,

Not too sure, u can go to Komtar and ask. tower 1 sold out, tower 2 not sure. heard will lauch last year, but till now seems havent lauch. details u can check in komtar

 
March 27, 2013 at 4:20 PMigrowth

This Centrio Avenue is cheaper as compared to Penang Pakatan Govt project "affordable house" 1000 sq ft RM400,000

meaning state govt selling RM400 per sq ft, lagi kena buat permohonan to Komtar tingkat 28

 
May 8, 2013 at 6:18 PMJesmine

bro, how can you compare to the project stated 2 yrs ago... if you can get new project 400 per sq ft.. pls act fast..... don't wait any more

 
June 19, 2013 at 6:01 PMUnknown

i m nt frm penang,,..izit hard to get tis approve although i m apply the form d?....so when tis project is done?

 
August 6, 2013 at 4:10 PMdoozer

sherlmie wee:
not from penang also able to get, but not for this project. This project too much applications, not easy to get. i think will complete by end of this year. you may drop by and have a look on the project. at bukit gambier.

 
August 16, 2013 at 3:22 PMUnknown

anyone managed to get an unit from tower 2?

 
August 21, 2013 at 3:41 PMOPATEfm - other projects are too expensive for me

d Hijab And Fashion: I understand how you feel.

I have also submitted the pink form MORE THAN 2 YEARS AGO. Still no feedback. How long have you waited? If a penang-born middle-aged man with low income like myself can't get an LMC unit I really don't know who can. Other private projects are priced lifetimes beyond my financial means. New projects are priced at RM600k and above. I'm very worried.

 
August 27, 2013 at 12:17 PMGAry SAvage

my frens auntie ,she have 2 son just back frm sg with high salary pay....and i heard tat they already get the offer letter from LMC after they submit the apply form 3 month....that is nt fair....rich ppl and gt property already can get...but for those ppl dun hv both...still in waiting list....LMC not more low medium cost....its stand for 'LETs Make Cash'...for those are rich...

 
August 27, 2013 at 1:31 PMUnknown

LMC Project how to apply?? long time submit the form still need to wait a new!!! low salary ppl how to get a LMC house, now new project all more than RMXXK how to buy ahh....ai.....

 
August 31, 2013 at 5:58 PMMichael

form aldy submt 3 year aldy aldo no get ....how govement work???

 
August 31, 2013 at 6:01 PMMichael

i have listen ppl say got undertable give money to get there lmc house,, how can like tht.they also got house aldy still can buy??

 
October 29, 2013 at 11:37 PMdoozer

The unit worth 300k now?? seems expensive for only 650 sq.ft. unit

 
November 2, 2013 at 12:24 PMAnonymous

New intake list already come out
Everywhere hear about under table.
DAP its time for you to catch up all under table purchaser, since we are support you all the time.,
Please Do Not make Penang lang upset and dissapointed

 
November 3, 2013 at 3:51 PMAnonymous

last july 2013 when I see my status is "DALAM PROSES TAWARAN (BERJAYA)", but now novermber 2013 suddenly I check my status is already change to "DALAM SENARAI MENUNGGU"!! OMG.... I do know what happen???

 
November 3, 2013 at 5:03 PMAnonymous

Where to check the new intake list? When will be the final list come out? Thanks.

 
November 3, 2013 at 5:17 PMAnonymous

Mohd Firdaus or anyone might to share where to check status?

 
November 6, 2013 at 2:24 PMAnonymous

too late to check as the house already complete 95%... no more low cost housing from penang goverment until 2016 as the land is limited edition and mostly will build condominuim or seaside house..

 
November 12, 2013 at 8:40 AMAnonymous

This projek like gold very expensive , please give this house to need people , dont make money ...... rakyat didahulukan katanya , tapi habuk pun tak da untuk rakyat .... jangan pilih kasih , jangan kayakan orang dah kaya , beri peluang untuk yg memerlukan ..... DAP KA BN KA , SEMUA SAMA JA , CAKAP TAK SERUPA BIKIN ....

 
November 12, 2013 at 9:05 AMAnonymous

I and my friend submitted the PINK form together. He got it and I have none.. Query how they process the application?

 
November 13, 2013 at 3:15 PMNian Pik Yi

Hi... May i know roughly how long the developer will send the Letter of Offer to those successful applicant?

Lets say for example :
Perumahan's letter is 01/10/2013, then when shall Developer get back to the potential buyer / successful applicant?

 
November 14, 2013 at 2:26 PMAnonymous

To Pik Yi, I would say they can't even answer you this question and no guarantee that you will get it. Some applicant have been waiting for years also not receive any

 
November 25, 2013 at 1:19 AMChole

The YB say only stay Timur Laut ppl can get the house other place cannot get the house !!!
Why like this???!!! their parents got money can buy near Timur Laut's house...
but other state like prai ppl or Barat Daya work in Penang but cannot entitle for get the LMC house at penang ??
They need everyday travelling go to work... YB don't know how tired they are now,.,,
Some more hear friend say their undertable agents said he sure can get the house ald...
Why so no fair...

 
November 28, 2013 at 8:52 AMKhoo

I called yesterday, the starting price is from 150k, each floor + 500

 
November 28, 2013 at 11:47 AMAnonymous

Khoo,

Would you mind telling us more?
Whom did you call?
Stating the price this way, are you saying that you were able to purchase direct from someone?
How does all this work?

 
November 28, 2013 at 4:04 PMKhoo

not direct purchase, have to submit pink form and gov will draw. The name list already out, they did an upgrading plan for this apartment, price is RM176,000(corner unit), 1 car park + tiles + kitchen cabinet and 1 fridge.

 
November 28, 2013 at 7:40 PMUnknown

d apply for 2 years~ when i can get my home??

 
December 10, 2013 at 10:42 AMUnknown

yes ppl who have address timur laut stated in IC only can entitle to buy for this project, others cannot.this is truly fair to everyone.i just get one

 
December 16, 2013 at 11:26 AMserinabayresidencecomplaint

Perbincanggan oleh kerajaan negeri nampak macam Tolak Tarik dah 3 Kali berjumpa YB jagdip sigh berjanji nak membantu ... Sehingga hari ini 12.12.13 , Lebih kurang 40 orang yang menerima Surat tawaran Daripada kerajaan negeri berkumpul di Pejabat Pemaju Dari pukul 11:00 Pagi hingga 4:00 Ptg sia sia malah telah dipanjgkan berkumpul di Depan Dewan undangan negeri hari ini untuk meminta yb jagdip turun memberikan jawapan tapi mereka hanya hantar pa Nya dan berjanji lagi untuk bermesyuarat dengan kami ...

Maklumat terkini pihak Pemaju
Duwata SDN BHD hanya setuju untuk memberikan kami harga Rumah rm72,500 tetapi hanya untuk tingkat 12,14 dan31 Daripada 850 unit Rumah ... Ini tidak adil ... Malah meminta kami membeli parking asing dengan harga rm28k ... Menjadikan nilai Rumah Daripada rm72,500 Ke rm111k pula ... Ini bagi saya hanya untuk menutup mulut kami ... Ini tidak adil kepada yang lain ... Kerana mereka Jual unit Rumah disini dengan harga rm160k ketas ... Sedangkan ini Adalah project dibawah program membantu rakyat berpendapatan rendah di pulau pinang dibawah kerajaan negeri pulau pinang .

 
December 16, 2013 at 11:30 AMserinabayresidencecomplaint

Project Perumahan Kos Rendah Krajaan negeri Pulau Pinang With Nuwata Sdn bhd Boon siew Group Harga RM72,500.00 Bertukar Ke RM160K Why ?
Project Perumahan centrio avenue di Bukit gambir di Bawah usaha kerajaan negeri pulau pinang untuk membantu rakyat miskin memiliki rumah mampu milik Antara reality Atau fantasy ?... Mengapakah harga rumah yang ditawarkan kerajaan negeri pulau pinang tidak sama dengan harga yang dijual Pemaju ... Berikut gambaran di Pejabat Pemaju :

1. Brochure Pemaju
2. Gambaran di Depan pintu Pejabat Pemaju yang di kunci hanya orang yang Ada Surat tawaran Daripada kerajaan negeri sahaja Boleh Masuk
3. Kenyataan harga pada brochure dan Surat tawaran kerajaan negeri kepada yang berdaftar dengan Pejabat Perumahan Komtar pulau pinang .
4. Surat Aduan Daripada salah seorang pendaftar pencari rumah dengan kerajaan negeri pulau pinang tentang ketidaksamaan harga ditawarkan Pemaju dan kerajaan negeri .

Dalam mencari kebenaran dan keadilan pembongkaran terus dibuat ... Persoalanya adakah ini betul dan Adilkah jika diperlakukan sebegini ?

Persoalanya Sekarang :

1. Kenapa harga berubah ?
2. Kenapa Tiada tindakan Daripada pihak berwajib ?
3. Down payment 10% Daripada harga rumah untuk dijadikan booking fees ... Mampukah mereka ?
4. Loan ditawarkan 90% 30 Tahun
5. Nak buat pengeluaran kwsp kena Ada sales and purchse agreement baru Boleh dapat keluarkan Akaun 2 ... Dimana nak cari rm16k sama dengan 10% booking fees untuk orang miskin ?.
3. Panel Bank Pemaju di Pejabat mereka hanya Akan luluskan joint name loan seorang tak Boleh kenapa ye ?...

Post selepas ini Adalah rakaman amateur dibuat bersama salah seorang yang mendapat Surat tawaran Ke Pejabat Pemaju ini dan reaksi beliau selepas keluar Daripada Pejabat Pemaju ini .







Lagi Update Tentang Kes Perbezaan Harga Unit Rumah Projek perumahan centrio Bukit gambir Pulau pinang Dibawah Program Kerajaan Negeri Pulau Pinang dan pemajunya Nuwata Sdn Bhd .

tarikh : 03.12.2013
Bertempat : Pejabat Komtar Pulau Pinang

Difahamkan reporter turun Bersama Sama Pembeli Pembeli Yang Mendapat surat daripada Kerajaan negeri Untuk tawaran Projek Perumahan Ini yang tidak Puas hati Dengan Perbezaan Harga Kerajaan Negeri Dan Pemaju .

YAB Jagdip singh DAP telah turun padang dalam menyesaikan hal ini ....

Kita Tunggu dan Lihat Apa Hasilnya nanti

Pembongkaran akan terus dibuat jika berlakunya ketidak adilan dalam membantu semua rakyat di pulau pinang ini yang terlibat dalam mendapat surat tawaran dengan harga rumah RM72,500.00 Kepada Semua yang menerima Surat Pelawaan Ini .

Bagi saya jangan Hanya Bila Dah Cerita jadi Besar Mulalah Nak tutup Tembelang dengan Melakukan Favourtisme Dalam Membantu Rakyat Miskin dan berpendapatan Rendah Di Pulau Pinang ini .Keadilan Mestilah untuk Semua .

dan bagi saya Semua maklumat yang diperlukan berada Ditangan MPPP sendiri Mereka tahu Siapa yang Mereka hantar Surat surat Tawaran Ini .. sebagai Kerajaan Negri yang perihatin Mereka Boleh buat Press statement Atau menghantar Surat Penjelasan Kepada Semua Rakyat Yang Mereka dah hantar Surat pelawaaan Itu Bagi Menjelaskan Tindakan Mereka Seterusnya Dalam Menangi Masaalah Dan Membantu Mereka Mereka yang terasa Tertipu Oleh Pemaju Dengan Kenaikan Harga ini .

Mari Kita Lihat Adakah Kerajaan Negeri Cakap serupa Bikin Ke Atau Sebaliknya ?

 
December 16, 2013 at 11:31 AMserinabayresidencecomplaint

Keluasan unit rumah project centrio avenue Bukit gambir untuk kerajaan negeri pulau pinang bagi membantu rakyat memiliki rumah mampu milik di PULAU pinang . Keluasanya 680sqft . Lebar 2 sisi tingkap bilik tidur dan ruang tamu Adalah 9sqft . Jika diletakkan Katil tidur didalam 2 bilik tidur ini tinggal 2 kaki untuk bergerak begitu Kecil dan sempit . Rumah kosong Tiada lampu panjang pun dipasang cuma point . Yang di beritahu cuma kitchen kabinet yang dipasang Bukan sinkki basuh gantung biasa . Persoalanya Daripada nilai rm72,500.00 Boleh berubah sehingga rm160,000.00 , Perbezaan rm87,000.00 setiap unit Daripada 780 unit rumah keseluruhan yang berjumlah rm76,125,000.00 nilai yang dikatakan Pemaju bagi Naik taraf
1.BBQ area ,
2.kitchen kabinet , 3.children playground , 4. 24hour security , 5.gymnasium
6.card excess lobby lifts plus carpark lifts .

Persoalanya :

1. Kitchen kabinet itu kenapa perlu dimasukkan sekali dalam kos tambahan yang bagi saya bukankah ini bergantung kepada pemilik Petak ?

2. Retail outlet Pemaju untung dijual Bukan bagi free , Jadi ini tidak Boleh dimasukkan tambahan kos pemilik units ?.

3. Security card excess , security berapa orang , playground dan gymnasium tak kan sampai rm72 juta kos Nya ?.

3. Kenapa ruang kosong air well pun dikira lumpsum dalam Jumlah Keluasan unit rumah ini 680sqft .

4. Adakah rm160k ini berbaloi dengan Keluasan dan facility yang disediakan , Tiada swiming pool yang disebut , Tiada Dewan KOMUNITI yang disebut , Tiada reflexsiology track yang disebut , Tiada sauna yang disebut . Atau kemudahan kemudahan lain yang Boleh kita sama nilai dengan nilai peningkatan yang dikenakan Pemaju kepada pemilik Petak ?.

 
December 16, 2013 at 11:57 AMcondomana

@Mohamad Amin Amin

This is an attempt by unscrupulous developer to jack up property price in Penang. After their attempts to jack up price on mid price and luxury condo, this developer is turning it's focus on low cost housing now.

It is wise for you to make this an issue, so that everyone knows what this boon siew is up to. Boon Siew is a major land owner in Penang. The higher the property price, the more prosperous they become.

You might want to consider boycotting some of their businesses, example, bayview hotels, honda cars and motorbikes, hospital(bagan specialist) just to name a few....:)

 
December 16, 2013 at 1:15 PMhani

sy pun dlm kes dilema skrg. dpt surat dari perumahan. yg sy dimaklum sekarang unit 15 floor ke atas yg masih kosong. tower 1 dah habis jual 2 thn lepas. tinggal tower 2 skrg. adakah tower 1 di jual dgn harga 72k? dan bgi pemilik di tower 2 terpaksa beli dgn harga 160k skrg. tapi facilities suma di nikmati bersama. apa privilege bagi tower 2? nothing rite?

 
December 16, 2013 at 1:44 PMAnonymous

@Mohamad Amin Amin

You should take condomana advise to boycott BSG related business. Include give up this project.

 
December 17, 2013 at 7:35 PMUnknown

Give up this project as I dont pay 72k too. I also pay a premium for this centrio avenue. Just wait for those really 72k project while leave to those can buy 160k to take this project. tower 1 not selling at 72k 2 years ago

 
December 18, 2013 at 11:03 AMcondomana

@Dennis Phoon

Whether to give up the LC unit is one thing, but what Mohamad Amin Amin is trying to highlight is by principle, when you offer people a low cost flat at RM72k, how can you end up asking for RM160k??....:)

 
December 20, 2013 at 7:52 PMKhoo

Solicitor letter ask to pay the 10% and sign the snp...
anybody receive the same letter?

 
December 29, 2013 at 9:42 PMJesmine

hi, any body know when is the completion of this project?

 
January 7, 2014 at 9:57 PMcheahtf

BSG must be blacklisted by the state government. They always sell their houses above the approved price by the housing ministry. The price for low cost house is fixed at RM 42,000 and low medium cost at RM 72,500.Normally the state government allow them to charge extra RM 25,000 for basic renovation and car park lot at RM 20,000 to offset the high cost of land and building materials. The above is charged by Ivory Properties for their Taman Bukit Erskine, Low Medium Cost Project.It is a 38 Storey Block. The built up area is 650 sq. ft.

 
January 7, 2014 at 10:08 PMcheahtf

It is not possible for a family income of less than RM 3,500 per month to get a bank loan of 90% of RM160,000 ie RM144,000. BSG must practice corporate social responsibility.

 
January 21, 2014 at 3:18 PMvivian

when OC?

 
March 6, 2014 at 2:35 PMUnknown

anyone know when OC, and buyer to collect their keys?

 
March 18, 2014 at 11:22 AMUnknown

summer lee, you got your keys to the apartment already?

 
March 18, 2014 at 11:25 AMvivian

Diane, NOT YET

 
«Oldest  ‹Older   1 – 200 of 570   Newer›  Newest»