Pulse is a residential project by Nusmetro located at Gelugor, off Jalan Yeap Choy Ee, Penang. Situated just next to the Oasis Condominium, Pulse is strategically located with easy access to Bayan Lepas and Georgetown. Pulse consists of 249 apartment units in total.
Property Project : Pulse
Location : Off Jalan Yeap Choy Ee, Gelugor, Penang
Property Type : Apartment
Tenure : Leasehold
No. of Blocks : 1
Total Units : 249
Built-up Area : 783 sq.ft. - 850 sq.ft.
Developer : Nusmetro Venture (P) Sdn Bhd
297 comments«Oldest ‹Older 1 – 200 of 297 Newer› Newest»
- April 14, 2010 at 3:11 PMching
- April 14, 2010 at 3:23 PMUnknown
- April 14, 2010 at 3:55 PMIvy
- April 14, 2010 at 4:09 PMAnonymous
- April 14, 2010 at 4:14 PMDexter
- April 14, 2010 at 4:21 PMUnknown
- April 14, 2010 at 5:11 PMMus
- April 14, 2010 at 5:39 PMUnknown
- April 14, 2010 at 6:26 PMJoe
- April 14, 2010 at 10:55 PMUnknown
- April 14, 2010 at 11:23 PMJeffery Lim
- April 15, 2010 at 12:03 AMUnknown
- April 15, 2010 at 9:32 AMandy
- April 15, 2010 at 7:12 PMsokohaw
- April 16, 2010 at 12:03 AMDeborah
- April 16, 2010 at 6:01 AMTim
- April 16, 2010 at 9:30 AMUnknown
- April 16, 2010 at 11:08 AMameer
- April 19, 2010 at 9:51 PMpenang guy
- April 20, 2010 at 9:03 AMandy
- April 30, 2010 at 11:03 AMUnknown
- May 25, 2010 at 11:33 AMBliss109
- May 25, 2010 at 11:36 AMBliss109
- May 25, 2010 at 1:05 PMSLG
- May 31, 2010 at 10:51 PMIn Style
- June 1, 2010 at 10:57 PMUnknown
- June 5, 2010 at 9:34 AMVT
- June 8, 2010 at 9:53 PMIn Style
- June 21, 2010 at 4:42 PMSLG
- June 28, 2010 at 10:01 AMHasan.M.
- June 29, 2010 at 11:18 AMWinson Teo
- July 3, 2010 at 12:07 PMImTyanz
- July 13, 2010 at 10:19 AMchloe
- July 17, 2010 at 1:16 PMAnonymous
- July 19, 2010 at 7:18 PMVT
- July 20, 2010 at 11:49 PMAnonymous
- July 27, 2010 at 1:11 PMCEJ
- July 27, 2010 at 9:53 PMandy-84
- August 1, 2010 at 11:20 PMCEJ
- August 2, 2010 at 1:28 AMandy-84
- August 4, 2010 at 9:48 AMSLG
- August 5, 2010 at 9:34 AMandy
- August 6, 2010 at 9:41 AMandy
- August 6, 2010 at 2:57 PMCC
- August 6, 2010 at 4:48 PMSLG
- August 6, 2010 at 10:24 PMandy-84
- August 9, 2010 at 2:09 PMCC
- August 10, 2010 at 10:15 PMandy-84
- August 12, 2010 at 9:08 AMCEJ
- August 12, 2010 at 9:00 PMandy-84
- August 13, 2010 at 9:08 PManne
- August 18, 2010 at 9:33 AMSLG
- August 23, 2010 at 10:10 AMSLG
- August 23, 2010 at 11:34 AMHanson
- September 3, 2010 at 10:07 PMandy-84
- September 5, 2010 at 10:02 AMVT
- September 6, 2010 at 4:17 PMCEJ
- September 7, 2010 at 9:09 PMVT
- September 14, 2010 at 8:55 AMandy
- September 16, 2010 at 12:46 AMandy-84
- September 18, 2010 at 1:05 AMUnknown
- September 20, 2010 at 9:32 AMCEJ
- September 26, 2010 at 1:59 AMUnknown
- October 5, 2010 at 10:01 PMandy-84
- October 23, 2010 at 9:06 AMSLG
- October 26, 2010 at 10:24 PMCEJ
- October 31, 2010 at 12:01 PMVT
- November 2, 2010 at 9:32 AMCEJ
- November 2, 2010 at 11:40 AMHasan.M.
- November 2, 2010 at 2:44 PMEuge
- November 11, 2010 at 11:01 AMUnknown
- November 11, 2010 at 8:54 PMandy-84
- November 22, 2010 at 10:56 PMandy-84
- December 6, 2010 at 11:15 PMandy-84
- December 9, 2010 at 4:52 PMandy
- January 2, 2011 at 12:36 PMandy-84
- January 31, 2011 at 6:50 PMUnknown
- February 13, 2011 at 11:52 PMHasan.M.
- February 18, 2011 at 5:19 PMMuralitaran Subramaniam
- February 22, 2011 at 9:09 AMVT
- February 22, 2011 at 2:54 PMCEJ
- February 25, 2011 at 3:05 AMMuralitaran Subramaniam
- February 27, 2011 at 5:46 PMCEJ
- February 28, 2011 at 2:24 PMMuralitaran Subramaniam
- March 1, 2011 at 11:46 AMLaaveniya Mugen
- This comment has been removed by the author.
- March 1, 2011 at 9:42 PMandy-84
- March 2, 2011 at 8:55 AMLaaveniya Mugen
- This comment has been removed by the author.
- March 3, 2011 at 10:22 AMCEJ
- March 25, 2011 at 4:50 PMHasan.M.
- March 26, 2011 at 12:10 AMsimon
- March 31, 2011 at 12:32 PMLaaveniya Mugen
- This comment has been removed by the author.
- April 11, 2011 at 9:51 PMUnknown
- April 11, 2011 at 10:13 PMandy-84
- April 12, 2011 at 11:06 AMLaaveniya Mugen
- This comment has been removed by the author.
- April 13, 2011 at 5:13 PMUnknown
- April 17, 2011 at 10:01 PMUnknown
- April 18, 2011 at 10:22 AMVT
- April 20, 2011 at 3:00 PMUnknown
- April 23, 2011 at 9:52 PMUnknown
- April 23, 2011 at 9:59 PMUnknown
- April 23, 2011 at 10:04 PMUnknown
- April 29, 2011 at 4:25 PMSandyLee
- May 15, 2011 at 3:49 PMTeng Kee
- June 25, 2011 at 5:38 PMLadyShoppes
- June 27, 2011 at 4:42 PMCEJ
- June 30, 2011 at 9:27 AMSLG
- July 13, 2011 at 8:08 PMkarisma28
- July 21, 2011 at 11:10 PMMark
- July 22, 2011 at 7:40 PMkarisma28
- July 24, 2011 at 9:41 PMJewel Click
- July 25, 2011 at 2:29 AMandy-84
- July 25, 2011 at 8:42 PMJewel Click
- August 18, 2011 at 1:31 PMmicky
- August 18, 2011 at 8:50 PMkarisma28
- September 2, 2011 at 2:51 AMNoon
- September 2, 2011 at 2:07 PMCC
- September 6, 2011 at 12:14 PMsimon
- September 13, 2011 at 4:29 PMNoon
- September 13, 2011 at 10:26 PMandy-84
- September 15, 2011 at 12:07 AMNoon
- September 15, 2011 at 1:36 AMandy-84
- September 19, 2011 at 9:41 PMGAry SAvage
- September 24, 2011 at 4:16 PMRalph
- September 24, 2011 at 8:44 PMCEJ
- September 28, 2011 at 2:56 AMkarisma28
- September 28, 2011 at 2:59 AMkarisma28
- October 12, 2011 at 1:11 AMNoon
- October 12, 2011 at 9:27 PMkarisma28
- October 13, 2011 at 9:12 AMHasan.M.
- October 13, 2011 at 3:58 PMkarisma28
- October 13, 2011 at 4:42 PMHasan.M.
- October 14, 2011 at 1:55 AMNoon
- October 14, 2011 at 6:49 PMkarisma28
- October 14, 2011 at 6:51 PMkarisma28
- October 15, 2011 at 1:21 AMNoon
- October 20, 2011 at 1:01 AMNoon
- October 20, 2011 at 10:27 AMCEJ
- October 20, 2011 at 8:28 PMNoon
- October 20, 2011 at 11:28 PMandy-84
- October 23, 2011 at 5:09 PMCEJ
- October 24, 2011 at 11:29 PMandy-84
- October 27, 2011 at 8:21 PMkarisma28
- October 30, 2011 at 10:45 PMNoon
- October 31, 2011 at 11:44 PMkarisma28
- November 1, 2011 at 1:21 AMNoon
- November 1, 2011 at 4:58 PMCEJ
- November 3, 2011 at 9:45 AMEuge
- November 6, 2011 at 11:47 AMVT
- November 8, 2011 at 10:48 AMSLG
- November 13, 2011 at 11:13 PMNoon
- November 22, 2011 at 3:45 PMUnknown
- December 2, 2011 at 9:27 PMchong
- December 17, 2011 at 5:29 AMNoon
- December 22, 2011 at 8:41 AMCEJ
- January 5, 2012 at 6:16 PMUnknown
- January 6, 2012 at 8:55 AMCEJ
- January 15, 2012 at 5:35 PMchong
- January 17, 2012 at 12:49 AMNoon
- January 17, 2012 at 12:53 PMLaaveniya Mugen
- This comment has been removed by the author.
- January 19, 2012 at 10:17 AMUnknown
- January 28, 2012 at 2:24 AMNg
- January 30, 2012 at 2:07 AMkarisma28
- January 30, 2012 at 10:38 AMCEJ
- January 31, 2012 at 10:28 AMTeng Kee
- January 31, 2012 at 11:18 AMLaaveniya Mugen
- This comment has been removed by the author.
- January 31, 2012 at 12:42 PMCEJ
- January 31, 2012 at 12:46 PMLaaveniya Mugen
- This comment has been removed by the author.
- February 8, 2012 at 10:00 AMCEJ
- February 20, 2012 at 4:23 PMVT
- February 21, 2012 at 8:52 AMSLG
- March 8, 2012 at 8:48 PMHasan.M.
- March 9, 2012 at 2:05 PMUnknown
- March 10, 2012 at 8:19 PMVT
- March 22, 2012 at 12:01 AMNoon
- March 22, 2012 at 3:50 PMLaaveniya Mugen
- April 3, 2012 at 12:16 AMNoon
- April 6, 2012 at 11:49 AMWinnie
- April 6, 2012 at 12:11 PMLaaveniya Mugen
- April 17, 2012 at 12:14 AMNoon
- April 24, 2012 at 3:24 PMdaniel
- April 30, 2012 at 11:12 AMNoon
- May 3, 2012 at 7:07 PMvasunair69
- May 4, 2012 at 9:11 AMCEJ
- May 5, 2012 at 10:26 PMandy-84
- May 6, 2012 at 10:39 AMVT
- May 9, 2012 at 11:39 PMsatu m'sia
- May 9, 2012 at 11:40 PMsatu m'sia
- May 10, 2012 at 11:38 PMandy-84
- May 14, 2012 at 10:47 AMLaaveniya Mugen
- May 15, 2012 at 12:59 PMvasunair69
- May 16, 2012 at 3:02 PMCEJ
- June 2, 2012 at 1:00 AMandy-84
- June 10, 2012 at 12:18 PMkarisma28
- June 11, 2012 at 8:33 AMLaaveniya Mugen
- June 20, 2012 at 10:17 AMCEJ
- July 5, 2012 at 11:24 AMLaaveniya Mugen
- July 13, 2012 at 9:19 AMCEJ
- July 13, 2012 at 9:47 AMLaaveniya Mugen
- This comment has been removed by the author.
- July 13, 2012 at 10:20 AMPulseOwner
- July 13, 2012 at 7:01 PMvasunair69
«Oldest ‹Older 1 – 200 of 297 Newer› Newest»launch adi?
anybody have opinion regarding this project
Juz now i call up, they said alrdy sold out, only left bumi lot.
How come so fast?
What is the price?
Ivy,I thnk youare a liar. Just call them and they said that this project not yet launch.
This project for Penagites only.. I visit the booth during property fair in Gurney for the last couple of month.. it's very cheap property....about 750sq feet, about 130k, the target for low to medium income group.
Selvan, i owned one unit, and ivy is telling the truth.
is really sold out and left bumi unit
This project already sold out... Looks like apartment-penang.com a bit slow
Yeah... apartment-penang.com is slow nowadays. After finish launching, left bumi lot, etc.. only posted in website.
Almost sold out guys.
range between 150-250k
medium cost apartment
Regards
Jeffery
heard oasis project given to big time gangster contractor who did their mutiara heights project.
very very bad workmanship...visited fren staying there....terrible indeed....
die leow....oasis....die leow....
This is LMC project, if you want to buy for investment then after 5 years only can transfer the owner name.
Now a days developers in Penang are the most happy group, whatever project launch also "liau". As long as the location is good, price ranging at 200k--500k, people will sapu regardless of what quality given......don't even bother to see the show house!
Penang people rich-mah !!! Buy condos like buying kuih.
I do not think Penang people are rich. A lot of them secure loan up to 80-90%. The only reason they do that is because they believe the property price will go up very fast.
I went to the sales office some time last month, the sales person is very rude. He is not explaining the project at all but just keep having the voice out loud. I was thinking, we are just in an office of maybe around 400sf max but the tone he had is like selling in the market. He didn't even give me the information and just keep mentioning that the units available is limited. Luckily what they are building is LMC, if it is a luxurious condominium, i bet the sales will drop eventually.
Penang people arent rich but PENANG PROPERTY OWNERS are rich,they dont have 1 house but a few,if they want to do business,its simple,they just mortgage 1 house for cash...;)
is this leasthold ?????
Yes, It's leasehold. There are 2 types only, intermediate unit is RM163k for 783sqft and corner unit is RM205k for 850sqft.
not sure is it good for rental in future ?
hi gim,
u bought intermediate unit at which floor?
19th floor? RM163K?
i went to Nusmetro office last week, they just left corner unit selling at RM240k excluded legal fees.. all internediate lot sold out, just left Bumi lots havent released, even not much malay purchase n got left over unit the price oredi gone up ard RM190k plus, whoever bought earlier oredi earn money^^
Hi Steph,
Are you sure the purchase price has been raised up to RM190k? Just curious the purchase price of this leasehold property without swim pool also can be raise up so fast and high.
By the way, did developer tell you when they are going to release those Bumi lots?
hey where is the sales office at?
penang people is not rich at all, can you imagine there are graduates in 30s with 3k income? n now penangites are tight up with repayment loans, ending up lesser spending on luxurious foods, clothes, n entertainment
can anyone advice what is the selling price as of today?? Thanks
According to my banker, 20% of Bumi Lots already released recently..
Any idea which website will giving us up-to-date info? it seems that all sold out and i had missed out
Have they started for the foundation and pilling work?
Can we trust on this developer and this project? Just scare that this project will be abandoned.
just send my cancellation form to Nusmestro... i guess will have one unit available soon..
Anymore units left for sale? Sqft and price pls?
Winson : y cancel? which unit r u booking before?
Anyone bought this apartment?
Yea, i bought this , so far just paid the deposit , no collection from developer yet.
VT: Cool, i bought one unit as well. Soon there will be collection from developer, they are start to build the base now. :)
What is the facilities for this apartment?
gym, jacuzzi, landscape garden, children playground and sky lounge
So weird, got jacuzzi but don't have swimming pool...
andy-84,
May I know your purchase price? Is it RM163K?
i have 2 car parks so it is 173k.
What is the progress now?
If not mistaken, they have finished for piling.
Just went to that side, I saw a small Indian cattle farm there! Sigh......
i ve received the letter for 1st drawdown for piling..RM17k..
I just received the letter of 1st payment for piling around RM6900 only.
I receive the letter as well..
Anne, investment aside, any particular reason you are selling away you lot?
Andy, mind telling which unit you got?
Unit 11th. Christina, how bout urs?
All units area size are same?
Unit 1,6,7,12 is corner unit - 850 sqr feet
Unit 2,3,4,5,8,9,10,11 - 780 sqr feet
hi christina, it's solely for investment purpose. buy and sell properties...once, i've got the profit i want, i'm willing to let go :)
Hi Anne,
Just curious how can you sell LMC within 5 years, mind to share? Thanks.
How is the progress now?
latest selling price RM240k for 890sq ft, qbt RM269.66 per sq ft, worth to buy?
Any updates?
i loan 90%, first 15% of loan is on the way release to developer.
Is great to see they are building the first level of Pulse ^^, hopefully it can complete earlier ~
When is the complete date?
According to contract , complete date is 2013
Recently they are building 2nd floor.
A good progress on it..
Jaren,
Corner unit is not under LMC, it is normal apartment type. So you can sell whenever construction is done.
Anyway I am one of buyer of Pulse, plan for own stay because of strategic location :-D
Does anyone do notice that there are a small cattle farm? Does it will be remove after construction completed?
All,
Does your guy know this house own title(Galan) only states RM75K. But they are selling RM200K.
4th floor now..
Yesterday, passed by that area. Saw that at least 30 cows over there......
Seems like nobody is concern on the small cattle farm...
This is what I'm heard: Cattle farm suppose to move away , but the farm owner refuse to do so.
Visited yesterday , 5th floor almost completed.
Oasis about 6th floor right now, good progress.
If this project has been completed but then the owner still don't want to move their cattle farm then what to do?
Change that area name to "Kampung Lembu" then... hahaha...
I think there will be very congested and messy. Maybe there are a lot of investor, so that nobody really concern about this.
Anyone know any link to the floor layout?
There is no floor plan on official website. Try to get it from the sales office. :)
6th floor now :)
7th floor in progress..
Why the progress is slowing down recently?
8th floor now..
may i kno how much is da unit for now?last time i saw is 165k n 205k right if not mistaken..anyone kno da latest price?
After this project has been completed, 163k will become 200k & 205k become 250k. After OC obtained, 200k will become 250k & 250k become 300k. So means that, no more 163k & 205k for this project now.
Good news for the buyers....Latest update for the Pulse project the Nusmetro Developer plan to build on swimming pool..Yahoooo!!!!
really ? Where's the swimming pool going to locate ? Root top ?
I don't think there are enough space for swimming pool. Unless they take off jacuzzi to become a swimming pool. If it's a mini pool, then not sure how many person can swim at the same time...
Yes the developer plan to remove 1 jacuzzi and replaced with 1 swimming pool.I hear that plan to build as standard size not a mini pool.
Hopefully the developer is not tell lie, it will be a big present & surprise for the owners.
We have to wait and see until the project end of complete..then only we able to know whatever their promise has done or not...
13th floor now.. :) wish there really a swimming pool built :)
Normally, OC will be obtained after 3 to 6 months...
I don't think got any owner will let go their unit before OC obtained because this apartment build at good location & low density. I estimate the price will be raise up => 50%.
just heard a news no fans or kitchen cabinets will be install for the pulse heard they over build extra square feets ,is it true? That means buyers only get marble for supplemental payments made.
any one know the maintenance fee for the pulse?
any floor plan available to see? any unit still available? thx.
17th floor in progress :)
The maintenance fee should be 15 cents per sq ft.
No floor plan available from Nusmetro web, i think is better you go to sales office to get it.
i have went to sale office to ask for the floor plan, but they dont have. any 1 can share the floor plan? and any 1 know that when the bumi lot can be transfer? thx
seem like no 1 have the floor plan....
any 1 see the floor plan b4?
Hi Thiam Kim ,
This is from Facebook link, not sure do you able to see this..
http://www.facebook.com/media/set/fbx/?set=a.106606004581.94053.771434581#!/photo.php?fbid=358156009581&set=a.106606004581.94053.771434581&type=1&theater
Hi VT,
the link u post, i can't see.
thx
hi, i think u all misunderstood. last few week i go to the office, the sale person told me no jacuzzi. only had mini pool.
pulse project is under gov join nusmetro ?
how come the project still in progress & not yet complete y buyers u can sell ?
can anyone buyers answer my question r ?
thanks
hi andy,
this project not leasehold la. only 99 years. pls double check v your sale person / view back your agreement if u have it. thanks
hi thiam kim,
i ask b4, there r no flr plan / show room to view because is a low medium cost project.
May i know wat is the price for now?
Really a good progress!!!
Let's keep finger cross on it
Does anyone know is there anymore units left?
Thanks
Seri Nilam apartment (Tunas Muda completed project) opposite PISA currently asking 250k for 700sqft without any facility. So do you think that The Pulse selling price will hit 300k later?
Hi CEJ,
I also saw that a Taman Jubilee Apartment with 700sqft in Lip Sin Garden is selling RM218K. So I think it's possible the pulse's price will be raise up to RM300K.
what's the selling price right now???
Can ask > 300k if got 2 car park.
thank you for the info Mr Mark>>>>>.
as i know, cannot resell for 5 yrs as this is medium low cost apartment.. furthermore S&P and actual size of unit are not the same
hi jewel click, do you mean the actual size is smaller? how you know about the actual size info?
Hi Andy, i had the buying intention a yr back and finally decided to pull out and 5k deposit got refunded. i could not remember but i recalled that the S&P does match the actual size of unit and the price. that unit was RM228k (if not mistaken). this project is only available for first time buyer, income less than 3k or 2.5k per mth, cannot resell in 5 yrs time.
the apartment got two type .....one is low medium coast cannot resell for 5 years.....corner unit was not low medium coast can resell any time !!!
any interested ?? i got one corner unit wan to left....
what is the cost like? micky
Who can confirm that, is it no more Jacuzzi for this apartment?
the agent said that the jacuzzi will be replaced with a mini pool...i waas wondering if the mini pool is meant for fish spa =P
i have read the S&P for intermediate unit,can anyone tell me where or in which page is written cant sell unit for 5 years?
yes. replace with mini pool.. heard that the building was slant. and the developer is work on adjust it. anyone know about it?
really? where you get the info about the building was slant?
i get the info from the ppl live nearby there. i had buy a unit there. dunno this info is true or not?
i'm not sure if it is true. hopefully everything will get fixed soon. btw which floor you bought there?
are this apartment all fully sold-out?
I don't think the building is slant, they
are just complete until roof top.
The building isn't slant. I can see it everyday through my window!
Hi , just FYI ...just heard that this project is completing in advance ! ( disember 2011) what a good news.....
any unit would like to let go ? pls advise how the price would be........? thanks
i have 1 corner unit, worth how much now?
hi noon , how much to let go???? pls advise thks
I have a high floor intermediate unit. I'm going to sell it at least RM250K.
hi mr Hasan >>>> may i know the unit is bumi unit or non bumi unit? how many sq ft??? facing sea or? tq
I'm not sure my unit is bumi or non bumi unit, because I didn't ask the developer and developer also din't mention this to me. It's 793sqft(stated in S&P), so can consider is 800sqft. Between, there are only certain corner unit facing the sea. The rest is facing town, hill side or oasis condo. My unit is facing town side. I think you can check it out by searching "lorong buah pala" in google map.
350k
hi noon >>>> yours unit how many sq ft?? ownership transferable? any ideas about the cost transfer fees???
i noticed that got 1 unit to let go at mudah.com cost 280k++ 795sq ft....
corner unit, around 900sf.
do you all know, wat the developer build in front of the Pulse apartment? look like 3 storey block in front the pulse apartment.
If not mistaken, there are a community hall. But not sure why build 3 storey.
infront of tat space, better have a garden or swimming pool better.. 3 storey of community hall is useless.
If i not mistaken, the hall is not belong to Pulse properties, it is belong to the government. If anyone of us want to use it then we have to rent it.
Hi Andy-84,
I just curious, if the hall is not belong to The Pulse then why it has been built in The Pulse compound area?
Hi CEJ, Pulse and the hall are not in the same compound area if you refer to the SNP's building plan. Both have different entrance. I'm not too sure about the ownership of the hall. :)
saw lots of units to let go>>>>. but price quite high....288k+ n above....is it worth to buy?? any comment ?
288k++ is cornet unit?
nop ,,,, corner units asking for 350k ++
When O.C obtains?
Not too fast, just 80% of construction has been completed. The price will be raise up more.
The developer is save cost for this apartment? Why they just installed a cheap window glass instead of the window glass as Idaman Idris or the Central Park Low medium Cost at Batu Lancang?
Pulse photo taken at end of Oct 2011
https://plus.google.com/photos/114540763223331468530/albums/5671721803908449457?hl=en
Hi VT,
There are an error for this URL.
Hey VT, thanks for the photo, I think needs some money to renovate after O.C obtained.
is there any recent pics of the property...would really appreciate if could share it here...thanks
I called up da agent in regards to the sky lounge on the top floor. upon purchase, the sky lounge is being promised, but upon completion sky lounge has been withdraw. how can the developer CHEAT US of such package!! Without the sky lounge, the pulse is incomplete! It now look like an ordinary aprt! The feedback given was, if you like the lounge, you may work out with the future mgnt team, which consist of us, the buyer, to build it on YOUR OWN EXPENSES! This matter should be brought up to the utmost attention of all buyer!!!
no sky lounge, we can sue them?
When is the pulse fully completed? Seems like the progress is slow down recently...
This developer is the same ones who built Mutiara Heights in Jelutong . Workmanship is very very bad . All bathroom units having water leaking and very poor finish up.Sinking fund was finished up by the developer before they hand over to the JMB .
Untill today the Strata title is not even hand over.
To all thos buyers pls do re consider even the price is cheap and in the end you will end up cheated !!!!
Don't worry, this project is 90% completed. The new buyer will go to that side and check by themselve.
Noon, let's try to speak to our lawyer first, my lawyer is Tan & Partners. Your's? Can i have your email address such that we can align with the claimed. Those interested, please provide your email address as well. We shall check with the lawyer on how to go about it.
If you have better sugggestion, please advice.
my lawyer is ghazi and lim. my e-mail address is bryan_tcn@hotmail.com
Promises should be fulfilled
Mr Chong good effort, this is my email address
pradeep.isawasan@gmail.com
i got one unit also..my email is woantze@yahoo.com..my lawyer is ghazi & lim..
hi ,may i know what is the latest selling price for The Pulse.....any unit want to sell?
Yes, but I will only sell it after OC obtained.
Overall I see the building and structure is quite nice.
I am not sure how true is the sky park case. But, if they really don't keep their promise to build sky garden, let's hire a lawyer to study the S&P to ask for compensation.
Mugen,
Actually, I also not sure when it will be completed and OC obtained. Hopefully, as soon as possible.
Hi Mugen,
My unit is at High Floor 20th floor above. Haven't decided the price, the recent price is around 280K - 330K.
Heard that OC going to obtain around April /May 2012, is this true?
This project hasn't been 100% completed so I don't think the OC will be obtain before June.
Hi CEJ,
I don't think the market price will be 330k after OC obtained. It's bcos the recent market launching price for apartment or condo with facilities is already more than 500 per sqft. For an example, the belleview group old project Taman Kheng Tien and Harmony View are also raised up 150% from the lunching price. So, if The pulse is around RM300k then it's consider cheap already.
still no news when the OC will obtain?
Today i just received a letter from my bank for releasing money to Item(h) "The roads serving the said building" which is the last 5% for the installment.Hopefully OC can be obtained very soon ~ :)
Did you all already get the S&P agreement from Lawyer?
yup hmm mid of June 2011, received from my lawyer Tan & Partners
how much for corner unit now?
when the OC will be obtain? the building seem look 95% completed. I can't wait to move in.. I have bought a higher floor corner unit.
I've called Nusmetro office, updated by June OC will be obtained :) cant wait to move n too, some basic fittings shud be done too.
confirm no sky lounge d... mini swimming pool to replace.. what is the size for the swimming pool?
i'm penang ppl but have no housing n looking for 1. Anyone can Help. How much ? where can i get d developer? TQ GUYS
kylin: corner unit of this apartment is not under LMC. the rest of the unit is under LMC which need 5 ys only can transfer name.
any idea how much the rent will be?? and how much the current price for inter/m and conner house?? plz share,,thanks
Hi Noon, some of the owners are directly buy from the developer so I don't think they can't sell and transfer name within 5 years.
Just passed by, corridoor and carpark lights on. :)
Lights on ? ok to night i go to take photo and share with you all~
...VTSC
When the oc can be obtained ? Donn't think in June, perhaps be more realistic in sept
When the oc can be obtained ? Donn't think in June, perhaps be more realistic in sept
not sure when the OC can be obtained. hope to get it asap. :) today they are installing the lobby roof.
hai any buyers hv the photos of current condition of the apartment?
conner lots with sliding door n balcony,,,inter/m withot balcony n windows only,,, info only
OC not yet obtained, how to sell and transfer name?
Auto gate installed.
any ideas when to get the oc????
Hi Value Owners of Pulse....whats are the facilities lastly granted by Nusmetro?
The Pulse is LMC project, so does anyone knows whether it can be sell within 5 years?
Seems its completed, any news when the OC to be obtained ?
Told by developer they have already got the VP, so O.C. will be obtained within 3 weeks. They also said that this LMC project can't transfer name within 5 years.
I just called Nusmetro and yes, VP is going to be obtained within this month and they will start to install the front gate for all the units. Also, to clarify on LMC title, Corner Unit are not bounded with the 5 year constraint for transferring name. The selling Price for Corner Unit is now within RM350k to RM380K.
how much the rental rate will be??plz share,,