Ixora Heights


Ixora Heights Apartment located in a matured peaceful neighborhood of Sungai Nibong, with close proximity to University Sains Malaysia (USM), Equatorial & Vistana Hotels, Bukit Jambul Complex, eateries, public transports and market that are all within reach.

Ixora Heights Apartment is specially designed for comfort. Each unit is a spacious 960 to 1804 sq.ft. built-up area, with three bedrooms, two bathrooms for standard units and four bedrooms, three bathrooms for deluxe units. Both with a kitchen living-cum-dining room and an innovative balcony design.

Live in comfort with good ventilation and enjoy the panoramic view of the surroundings as each unit has a strategic corner position, 8 units per floor for standard units and 4 units per floor for deluxe units. Low density apartment, with only 148 units in total and all corner units, enjoy real privacy at Ixora Heights.

Property Project : Ixora Heights
Location : Sungai Nibong, Penang
Property Type : Apartment
No. of Blocks : 1
No. of Storeys : 20
Total Units : 148
Unit per Floor : 8
Built-up Area : approx. 960 - 1,804 sq.ft.
Developer : PDC Properties Sdn Bhd

Facilities
24-hours security, card access system, covered parking lots, landscaped gardens, reflexology track, children's playground, BBQ pit, Astro & Internet ready, car washing bay, multi-purpose hall, gymnasium, surau, recreation room, function room.

472 comments«Oldest  ‹Older  201 – 400 of 472  Newer›  Newest»

November 14, 2008 at 8:48 PMPositionT

Funny, why wait for Ixora? D'Residence should be your right benchmark.

 
November 14, 2008 at 9:32 PMUnknown

IXORA IS NOT WORTH TO PURCHASE AT ALL. PDC IS MAKING MONEY FROM IXORA TO COVER HALAMAN KENANGA LOW COST FLAT.

 
November 14, 2008 at 11:45 PMGreg

Brezza,
In my opinion, at least must have a nearer comparison, how can compare the quality of >RM700k D'Residence landed property with RM280k-RM350k Mutiara Pica apt. At least Ixora is at the closest price range under apt category. Similarly, it's incomparable the quality between PDC low cost flat vs Mutiara Pica.

 
November 15, 2008 at 8:47 AMPositionT

Hi Mutiara,

1. Mutiara Pica is 300k-550k.
2. Both of them are located on the same location and they are likely to adopt same contractor and project management team. Therefore, the quality control standard and workmanship should be close. Isn't a bit idealistic to expect same workmanship btw D'residence n ixora?
3. Those land property expensive bcs of land itself. You may be right not to compare Ixora with the bungalow, but I certainly expect the terrace quality same with Pica (medium cost).

And to Eric,

Do you have anything new? It is not a secret anymore that all private developer in Malaysia subsidizes their low cost project by charging higher price for their none LC project. That's why REDHA chairman request government to build more LC unburden developer from building more price competitive projects. And, please get your fact right, your fraudulent claim apply to all private developer, but PDC have access to MOH allocated fund for building low cost.

 
November 23, 2008 at 10:12 PMUnknown

I was impressed...the construction progress of this project is really up to speed... Almost done with the 6th floor already, should done with 8th floor by end of year. In term of structural work, they began by early August, right? Within 4 months, 7 floor done. Efficient contractor typically can complete 1 floor every two week in KL. With their current speed, Ixora construction should have no problem completed before end of 2009.

But, getting early OC at this sluggish time not necessary better off for all project, because while market sentiment is weak, property price is unlikely to appreciate much upon OC. Starting point is crucial for the later days yield. For medium low cost project like Ixora, demand for it is always strong in comparison to medium and luxury condo on Penang island.

 
December 4, 2008 at 12:54 PMsy

I notice from pdc that said government increase the petrol price. So, pdc also increase the maintenance fee. Now a day, petrol price already decrease, did somebody check with pdc the status of the maintenance fee. latest maintenance fee is 0.13/ft.

 
December 6, 2008 at 11:54 AMUnknown

Any unit left? I'm interested to buy!!

 
December 8, 2008 at 11:11 AMPositionT

SY,
When I refer to my current condo monthly audited expenses, it has little to do with petrol. Majority loaded by staffing and big portion go to electrical bill. If TNB could have improve their efficiency and cut redundancy, we could have much more disposable income in general.

Neetu,
Few more bumi unit available, check direct with PDC. None bumi, only from sub-sale market.

 
December 10, 2008 at 10:03 PMGreg

Correction.
Have checked, the air-cond deck area is not a hollow place, the resident can extend this area once strata is obtained.

 
December 11, 2008 at 2:44 PMRela Bee

how about the main door entrance.? what can we do with 110sq feet area? just fencing? can we build the wall?

 
December 11, 2008 at 3:01 PMRela Bee

Ixora came with Asses card activated lift security access.is this statement true.i also heard about this before but this ting is not mention in S&P?anybody can confirmed

 
December 15, 2008 at 12:40 PMsy

just can fencing

 
December 15, 2008 at 1:14 PMAnonymous

There're various ways to do:

1. Fencing as SY suggested, easiest and practical.
2 Close up with highly reflective glass door (double door). More privacy, just cost slightly extra, without offending the management. My neighbor done that and still able to get renovation deposit refund from mgmt.
3. Completely knock off & expand. Normally, mgmt won't allow this, but u can still do it at the risk of not able to get refund your renovation deposit. Cost a lot extra, very much depend on house layout. Risk of difficulty in getting approval for strata title if you dun wanna "spend" when authority know ur door.

 
December 15, 2008 at 7:22 PMAnonymous

The third suggestion is strictly prohibited, you may be asked by the developer to revert to the original structure even after you've built it, since by doing so, may cause serious problem to obtain strata for the entire apartment from the authorities.

You may proceed with the proposal only after obtaining the strata.

 
December 22, 2008 at 1:13 AMAnonymous

theBrezza,
Sori. I bought a unit in The Spring last Saturday.

-Serious buyer-

 
December 22, 2008 at 9:27 PMPositionT

Wah, you must be one queue up early. You deserve it, good luck.

 
December 23, 2008 at 7:28 PMAnonymous

Brezza, wat is yr let go price?

 
January 1, 2009 at 11:40 PMAnonymous

Heard there will be show unit soon at 2nd floor. Anyone can confirm.

 
January 3, 2009 at 11:09 PMAnonymous

Today passed by, saw workers installing windows exclusively for level 2 unit 7 & 8. For sure there're these two mock units or even better, show unit. Hope they would open it for public soon.

 
January 6, 2009 at 11:28 AMAnonymous

let me know once the show unit is ready

 
January 13, 2009 at 7:54 AMsy

Look like the Window glass is transparent color. Can we personally change to black color. anyone can advise?

 
January 14, 2009 at 1:10 AMvinz_pst

still available or all have been sold out?





--p--

 
January 14, 2009 at 6:53 PMPositionT

Not sure if PDC offer any upgrading package to tinted window during construction... else, you may able to make the change after OC.

A suggestion, dun change to black tinted, but high UV filtration tinted paper (any color u prefer). The effect is much better than changing the glass (more colorful, cheaper but depend on quality and brand, and better cooling effect). In this case, clear transparent glasses are more flexible.

 
January 15, 2009 at 7:55 AMsy

Brezza,
Thanks for your advise.

 
February 23, 2009 at 4:34 PMteQuiLa_poP

Anyone know when we should pay the 2nd installment for the extra carpark?

 
April 3, 2009 at 5:53 PMUnknown

I am interested on this condo , but according to PDC allunit was sold out , any subsales?Pls contact me , fenfenkoh@gmail.com / geoklai_lim@hotmail,com (msn/email)

 
June 24, 2009 at 12:56 PMsy

any extra carpark to sold

 
June 30, 2009 at 11:03 PMPositionT

I got extra one to rent. The car park binded to the unit legally, so impossible to detach car park alone and sell it seperately.

 
July 8, 2009 at 11:01 PMsy

Cheam & Brezza,
How must for rent?

 
July 10, 2009 at 1:56 PMMichael

Hi SY,

Rented about RM.150/month.
Think about it. Tqs

 
July 10, 2009 at 11:55 PMGreg

Cheam. You really like lion open a big mouth.

RM150 per month for car park rental at this type of apartment and area?
Believe the apartment maintenance fee also not that expensive. plus your rental, the buyer has to forge out nearly RM300 every month? For this fee one can stay in a more luxury condo with extra car park. or add a little bit more can pay monthly installment to buy one unit new low cost flat across the road.

My apartment just across the street at Taman Jubilee and the parking rental only RM60 per month. That even is the latest rate after last year increase (previously RM50)

Wow...wish u got all the luck for someone to rent your parking space.

 
July 11, 2009 at 1:59 AMPositionT

Cheam,

Don't worry, the demand is few times more than the supply. If you've done some analysis on the residential structure of your target tenants (suppose done by the time u bought the property or extra car park), they are either medium size families and young working couples, typically need more than one car park. The worst point of this project (this area indeed) is car park (and congested access with roadside parking). PDC only offer 16 extra car park, and the demand is huge (fully grab during balloting).

For those complaining, the rule is simple: take it or leave it.

 
August 15, 2009 at 6:20 PMMichael

Anyone know when is OC will obtain?
How is site construction Now?

 
August 16, 2009 at 1:19 AMPositionT

Stucture work of the higest floor of one block already completed, another block should be done in a week time.

Overall, I estimate it would take around 6-8 more months to complete all construction work, it is achievable subjected to the project management team. VP, for PDC project typically not more than 2 months,CF (OC) lagi cepat.

 
August 18, 2009 at 7:52 PMMichael

Yes, hopefully the OC will obtain soon.
PDCP Boleh! So i can move in before Chinese New Year 2010 loh! ha ha

 
September 5, 2009 at 12:56 AMdamien

any units of A or B to sell? interested buyer

 
September 16, 2009 at 11:16 AMteQuiLa_poP

Anyone know when can get the OC? I'm doubt we can move in by Q2 2010, since I don c any progress on the pavement,landscape garden ,parking lot ...

 
September 19, 2009 at 4:33 PMUnknown

Is there any buyer who is planing to let go their units? I am interested of purchasing. Thanks

 
September 21, 2009 at 2:02 PMUnknown

Helo,

I'm a owner, have a unit to let go. My unit comes with 1(original)+1(additional) car park. Still under construction, PDC say construction completed around Q1 2010. I guess OC around mid 2010. If you interested, please reach me at sschang1001@gmail.com. Any further information about construction, direct call PDC (04-6340111). Thank you.

Catherine.

 
October 7, 2009 at 6:09 PMzul

is the bumi lot release ? is it possible to get 1 960sq ft unit at level 10 or above ? what is the market value now ? thanks for sincere reply

 
October 8, 2009 at 11:20 AMPalymra

组屋漏水屡修不好 孙连发起诉首长
二零零九年十月五日 晚上十一时四十四分

(北海5日讯)来自槟岛立信花园的孙连发,在周一上午特地请假,到来诗布朗再也将他自2000以来面对组屋单位漏水,槟州发展机构屡修不好漏水事件一再复发的问题,向槟州发展机构主席即首长林冠英提出控诉。

“我是希望从和平的管道解决民生问题,多次求见首长不果,迫于无奈下通过房屋仲裁庭寻求协助,入禀起诉槟州发展机构主席林冠英,这也是托黄汉伟及黄伟益的启发。”

任职电子厂员工的孙连发将文件入禀之后,向传媒娓娓道出其心声及组屋漏水不获解决的困境 。

孙氏说,他曾多次闯上首长办事处欲见首长却遇阻扰,多次以国语及华语写信投予首长却石沉大海。

他指出,9月中旬曾会见黄汉伟向他寻求协助,然而,却遭到不客气对待,并对他在报章上的渲染给予严厉指责。他表示,黄汉伟对他将其问题大事在传媒上渲染感到非常不满,也没帮上忙,不过却表示可以向房屋仲裁庭寻求协助,起诉槟州发展机构。

他也曾以简讯及亲自见黄伟益寻求协助,在报导见报后,黄伟益才表示已查询槟州发展机构,也回信建议可寻求房屋仲裁庭帮助,起诉槟州发展机构。

孙氏说,槟州民联政府是想推卸责任。他也打趣道,难道黄汉传及黄伟益都不晓得,起诉槟州发展机构主席即是起诉首长林冠英。

“是他们的启发启示了我,迫于无奈下才选择入禀起诉槟州发展机构主席。”

孙连发于1999年购下槟岛双溪尼蒙光华学校后立信花园第6座组屋,入住1年内即发生厕所、厨房及卧房漏水事故,通知槟州发展机构维修后,漏水事件在2001年复发,继而在2003年3月及6月连续 发生。在2005年7月,则是第5次发生漏水事件。

孙氏寻求当时州议员吴竟诚的协助后,槟州发展机构曾做更换及维修工作。2009年1月期间,同样的漏水事件再次重演,而孙氏也从今年初开始,多番写信槟州发展机构,他们的回复却是该项维修工程已逾期18个月,法律下当局不再受理。

孙氏说,房屋单位漏水事故,也导致他6岁及11岁的孩子皮肤痕痒,得冲很多次凉,却也还是觉得不乾净。

所以,在今年5月及7月,他曾闯上28楼首长办事处,希望与首长会面反映其问题,却受阻不获进入。8月间他也曾以国语及华文写信求助首长,却也同样不获回应。

“除了黄伟益黄汉伟,我也曾找过黄泉安及杨顺兴,各种管道都试过了,却还是没有办法解决。”

“我是万般不愿通过法庭的程序解决问题,却也迫于无奈,这是槟州民联政府耍太极推卸责任,他们用法令讲话,也迫得我走一条路同样以法律方法处理。”孙连发这样表示。

在入禀书内,孙氏将前因后果列明,也认为槟州发展机构有必要负起维修及解决组屋单位漏水的问题。

http://www.kwongwah.com.my/news/2009/10/05/144.html


黃偉益:面對組屋屋主起訴‧檳發展機構將替首長辯護
2009-10-08 09:40

黃偉益(中):根據記錄,此機構曾為孫連發維修破損的沖涼房,左一為羅斯里。(圖:星洲日報)

(檳城)檳州發展機構將會在房屋仲裁庭,對一名屋主孫連發提出的起訴作出辯護,包括證明在房屋保證期,曾為孫氏維修破損之處。

此機構聲明,身為發展商,它已經根據房產業的法律對孫連發所購買的房產業負起應盡的責任,並將會在仲裁庭中辯駁。

檳州首席部長政治秘書黃偉益週三(10月7日)在檳州發展機構總經理拿督羅斯里陪同下,在新聞發佈會這麼說。

早前,孫連發針對其向檳州發展機構購買立信花園組屋的房屋單位,受漏水困擾長達8年,但是投訴無門後,入稟北馬房屋仲裁庭起訴檳州首席部長林冠英。

指孫連發試圖混淆事件

黃偉益說,根據房屋仲裁庭法律,任何人提出起訴,只能列發展商為答辯人,不是檳州首席部長。因此孫連發此舉有試圖混淆事件,這是不正確之舉。

他希望投訴者對州政府、檳州發展機構及政府有關公司採取行動之際,不是為了破壞檳州首長的形象或攻擊州領袖,而是應找到真正負責人的對象。

“維修費須承擔多久?”
購屋8年還要發展商負責

黃偉益也說明,孫連發曾向多名議員及市議員投訴,包括他在內,但他並非是啟發孫連發挑戰首長的人,當前最佳方式是讓適合的當局,對有關事件根據正確的實況作出裁決,因此希望孫連發不要誤導民眾,認為首長不關心有關問題。

他表示,對首長採取行動是須根據現有的法律,須尊重法律的程序,不能成為先例。一名屋主購買房屋8年後,還要此機構修理破損的房屋,那麼此機構須承擔的維修費何時休?

羅斯里:保證期內僅1次投訴
屋主應承擔屋內破損

羅斯里說,此機構是於2000年4月5日交屋,房屋保證期為期12個月。2000年5月17日針對孫連發投訴沖涼房漏水,根據工程專家的意見展開維修工作後解決。

他說,之後在保證期內,就沒有接到孫連意的投訴。

他說,保證期過後,也曾接到孫連發的口頭投訴,但不是書面的正式投訴。其實,保證期後,屋主的屋內破損不是發展商的責任,是由屋主承擔,除非是房屋公共之處破損。

http://mykampung.sinchew.com.my/node/79044?tid=6

 
October 8, 2009 at 11:11 PMGreg

Get to know Ixora Heights will only be completed in 1st/2nd quarter of 2011.

 
October 10, 2009 at 6:49 PMzul

comment to maintaniance.If they can solve the problem,not even 8 months or 8 weeks,house owner will give a sincerely thanks to the maintaniance workers.If they can't,even more then 8 years, they still have to take the responsibility to the problem unless the defect happen only after the warranty period.i think this is fair to both side.Everything should have a date on black n white.Thanks

 
October 11, 2009 at 7:16 PMzul

PSILY,absolutely support ,agree wat u said,sometime they 2 much, delay n tell period is over............too bad

 
October 21, 2009 at 8:10 AMmichael

Doesn't anyone know when the bumilot will be release where the building 80% completed?
How much their selling price? thanks

Allan

 
October 22, 2009 at 10:52 PMUnknown

Just went there on 21/10/09. All bumilots sold. No more conversion, no waiting.

BTW, Mutiara Pica confirmed is a no go.

 
November 2, 2009 at 4:15 PMmichael

Doesn't anyone know can we extend the air-con deck after OC obtained?

 
November 10, 2009 at 12:20 AMMus

Steven.. You wont get it for sure..//
when i bought the house before the price almost rm200k.. now u r begging for the price below rm200k with 2 carparks.. impossible dude.. u may dream of it

 
November 10, 2009 at 10:05 AMPalymra

hearsay there are seller targeting RM100K profit.Ha...

 
November 10, 2009 at 12:00 PMGreg

Willing to let go one unit high floor at RM310K.
Serious buyer only.

 
November 10, 2009 at 1:59 PMUnknown

FYI: I have booking for my dual car park unit at 285k... 200k? No jokes plz... Since Joe offer 310k (assume single car park & standard unit), I may reconsider my offer to higher price :)

 
November 10, 2009 at 2:23 PMPalymra

Hi Catherine,
Did you buy from developer or from subsale market?

For Ixora Heights (my opinion),
A standard unit at RM200K is a good buy;
RM200K - RM250K is acceptable; Any price more than RM250K is too expensive.

 
November 10, 2009 at 4:32 PMGreg

Decide to sell my unit (bumi), preferably Bumi's buyer. Not sure if the unit can sell to non-bumi.

Level 14 at RM220K.

 
November 11, 2009 at 9:36 AMmichael

Hi Catherine,
May i know which type you get for 285k?

 
November 11, 2009 at 10:28 AMUnknown

Jess,

I sell it for 285k, not buy.

I charge 35k for my 2nd car park alone. Back to economy 101, supply and demand. Parking could be a nightmare there in lip sin and every high dense area with condo (ocean view, villa emas etc), an extra car park make a whole lots of different. 2-3 car is a norm nows a day.

 
December 7, 2009 at 1:25 PMkchong

This is insane. the price is insane, the market is insane.

shout price like no basis. should we call this demand, or should we call this goreng? i am confuse indeed

 
December 9, 2009 at 12:45 PMUnknown

Ixora Heights
My unit comes with a covered car park.
Its facing towards the Pg Brige.

 
December 23, 2009 at 4:49 PMMichael

Hi All Interested buyer, construction on site as covered roof in progress. Looking like to be complete by b4 Chinese New Year. Anyone know estimat OC will obtain? Tqs

 
December 24, 2009 at 5:31 PMGreg

cheam,
Still long way to go. Currently, only the building structure and exterior of the wall are almost completed. Roof cover 70% only. Guard house 80% completed.

Even the top floor penthouse still without ceiling. There is still lot of interior works to be done and still in progress, including corridor, unit tiling, wiring, lighting, fencing, awning, sewerage system and many many more.

OC expected only end of 1st / 2nd quarter year 2011.

 
December 29, 2009 at 5:28 PMJack

Ryan,
Dont thinks need to wait for so long.
Based on loan amount release progress, it leave 35% of construction. OC can be obtained end of 3rd 2010.
Mark my note here. :)

 
December 30, 2009 at 5:34 PMMichael

Mr. Lim,
I agree with your expected OC time frame. they (Developer) targeting end of 2010. So this will matching & Celebrate next Christmas day will joys. HA HA HA. Noted; Anyone looking for rented car parking?

 
January 1, 2010 at 10:51 AMUnknown

yeah, joe. same here.

can i obtain info on how to convert a bumi lot to normal so that i sell it to non-bumi?

 
January 1, 2010 at 10:53 AMUnknown

HAPPY NEW YEAR EVERYONE..

 
January 6, 2010 at 10:26 PMGreg

Nasha,
There are certain rules to follow. Advertise the unit for sale is one of them. For further assistance and more details, you may call PDC Properties.

 
January 6, 2010 at 11:11 PMUnknown

what's the price range for standard unit (960 sqft) with 1 car park? middle floor .. maybe 10th floor .. considering to buy ..

 
January 7, 2010 at 5:13 PMEvelyn

anymore units for sell? Prefer lower floor, budget RM250K.

 
January 9, 2010 at 9:02 PMMichael

Hi Lo,
your budget RM.250K i think susah-loh to get it after OC obtain at this year end 2010. May increase $$$ properly RM.300/sq.ft. or more.

Anyone looking for Car Parking For Rent on Half Yearly basic???

 
January 10, 2010 at 3:42 PMCabai Perawit

nasha, i dont think dat bumi lot can sell to non bumi buyer after we bought the property. once we bought it, it will registered to gov agencies for record. correct me if im wrong.

 
January 10, 2010 at 7:55 PMMus

I just went to Ixora and just get in it, really frustrated.. it is not really spacious as what i expected.. I think my current home N-park is bigger than Ixora... the good thing bout Ixora is. it has bigger room when compared to Npark,,, but very2 smal living hall and dining hal.. I think big2 furniture is not suitbale for Ixora.. just do the zen style only.. really frustarted.. don't think that the price of 187k is worth it to buy.. what more for the 300k.. so ridiculous.

 
January 11, 2010 at 12:14 AMUnknown

hi,mus
i went to ixora 2 time already.What i saw is guite ok for me.The living hall is not too small,only the master room a bit small.Foyer before main door too big,u can fence up foyer after OC.i think u have a big family,so u need to buy >1000 sq ft apartment/condo.

 
January 11, 2010 at 7:49 AMJack

Hi Alan,
can we go inside now? i went there last saturday, but the worker not allow me to go in.
Have you took internal picture? could you kindly share with us in this blog?
very appreciate

 
January 11, 2010 at 3:47 PMMus

Alan, I'm still single. Plan to marry soon. Mr. Lim we won't b allow to go inside, the worker allow me to go in coz the supervisor wasn't there during Sunday. But if u want to enter it is on your own risk la. The building look fine from the outside, whenever u go in u may think that it takes more than 6 month to be completed. I think the OC will only b obtained the mid of 2011

 
January 11, 2010 at 6:53 PMJack

Mus, congratulate! Are you plan to have your marriage when u move into new house (Ixora)?
then we celebrate with... :)

Do you have any picture, can share with?

 
January 12, 2010 at 12:15 AMGreg

First of all, congrats Mus.

Have also told the guys here, Ixora expected to obtain OC only around 2nd Q 2011 or maybe later. Interior works just reach about 20% or less now.

 
January 12, 2010 at 12:20 AMGreg

Cabai Perawit,
On bumi-lot selling to non-bumi, it's possible. I've confirmed with PDC. Just that the owner need to fulfill certain conditions.

You're right too. All bumi lots sold were registered with Govt Agency, but once you are able to meet their requirements, sell to non-bumi is not an issue at all.

 
January 12, 2010 at 10:16 AMMus

Thanx to Ryan and Mr. Lim, yup I plan to marry after enter the house. Mr. Lim sorry I didn't snap any pic inside the building, it was a quick sneak in. I worry the building itself looks horrible from inside, u can hear lots of noise.. and also afraid of other workers who may think that I'm an intruder.

 
January 13, 2010 at 11:49 PMGreg

Mus, inside certainly looks horrible since interior work just at infant stage. Even the stairs plenty of cement stains scattered everywhere.

 
January 17, 2010 at 4:31 PMMus

Yup Agree Ryan.. really horrible

 
January 17, 2010 at 9:06 PMPositionT

I visited straits quay date back Dec'09... outside look 90% completed, inside cements everywhere too along the staircase... come one la, costruction before completion, regardless what price range, all about the same.

FYI: the commercial below the suites of waterside is called straits quay, by E&O

 
January 22, 2010 at 2:35 PMMichael

Hi All, I been visited the construction site dated 20th. Jan' 2010, progress on site look quick good/smooth/fast with Guard House, Grille Fence, Fence Wall, Refuse Collection Center, Main Entrance Porch Roof completed. Ya Hoo!!!
PDCP, BOOOOOOOOOLEEEEEEEEEEH.

 
January 25, 2010 at 8:38 AMsy

I just feel sad that PDC change the Floor plan. Initial floor plan and S&P is different.....

 
January 25, 2010 at 8:40 AMsy

Interior photo have been send to Penang property gmail. pls have a look

 
January 25, 2010 at 1:42 PMMus

how to see the interior photo SY??
should i subscribe the list serve to gmail??

 
January 25, 2010 at 2:25 PMJack

Hi SY,
Are you sent interior photos to apartmentpenang@gmail.com for uploading?
or where can we view, kindly advice.
Thank you for your sharing.

 
January 25, 2010 at 5:37 PMsy

The photo already posted by apartmentpenang

 
January 25, 2010 at 11:27 PMUnknown

hi sy,
can u tell us what is the different about initial plan and S & P?

 
January 25, 2010 at 11:41 PMGreg

sy,
What do you mean initial floor plan and S&P different? It's exactly the same la..
If you mean actual floor plan and S&P different also not right leh..

 
January 26, 2010 at 8:11 AMsy

Initial floor plan is the catalog from PDC. the different is Main entrance door already move to near Dinning and change the bath room design.

FYI, the actual floor plan is same as S&P.

 
January 26, 2010 at 9:44 AMJack

SY,
Thanks a lot for your photos, I afraid they must follow S&P instead of catalog.

I felt very disappointed on the soil stack in 2nd bathroom, why it built inside toilet instead of outside building.
SY, do you saw how the soil stack in 1st bathroom? isnt it same?

Anyone have idea can we extend our front door area and aircond deck?

 
January 26, 2010 at 10:50 AMteQuiLa_poP

Hi SY,

Thanks for ur photo sharing.
Btw, how did u get in to the building?
Is it open for view right now?

 
January 26, 2010 at 10:53 AMCabai Perawit

SY, agreed. Should be a wall separating main entrance and dining area. Aiseh, need more money to extend the front door.

 
January 26, 2010 at 12:26 PMMichael

HI SY,
Well done!!! Any idea that can we extend front
door & air cond leadge area immediately after OC Obtain. will PDCP allow us to do that???
TQs

 
January 26, 2010 at 12:43 PMsy

Mr.Lim and Michael,
1st bathroom can't see the soil stack. it put to the air cond desk there. base on PDC and S&P rule, we can't extend the front door. For the aircon desk, we only can do cage. This is what I know from PDC....If we still want to extend front door and aircon. I am not sure whether PDC will fine us or not

 
January 28, 2010 at 7:37 AMUnknown

ryan,
what are the requirements to fulfil by the owner before being able to sell a bumi to non bumi?

how much rent u guys think ixora can go for?

 
January 28, 2010 at 9:50 AMMus

Dear all.. is there any interior designer here?? mayb you can draw some interior design for the Ixora.. just wanna get an idea how to design my house.. and hopefully I can hire you to be my interior designer.

 
February 4, 2010 at 11:12 PMGreg

How PDC dare to put up a tagline "Apartment with Condo Design". No facility, from the photo interior also so so. Wondering upon completion which part of the apartment really looks like Condo design? or even near to it...

 
February 24, 2010 at 11:28 PMCabai Perawit

SY,
If im not mistaken, during my visit at PDC last year the saleswomen says we can extend the aircond deck after we received oc and srata title. Not sure about the front door. i plan to extend the front door, if we are allowed to do dat.

 
March 2, 2010 at 4:40 PMAlex Lim

a word of advised thru my experience:
for a property to appreciate in price we need standarzation including air cond and grille doors or etc
If everyone do cow -boy style ..i am sorry to say your property will look cheap and the price will drop instead of going up. Who loves for a property to drop and always follow the t&c and not the sales talk ..u may not like to hear it but it is the truth.

 
March 6, 2010 at 9:59 AMCabai Perawit

Found this info from EPBT. Ixora will has a swimming pool?

MPPP/OSC/PM(660)/09(LB) : Permohonan Kebenaran Merancang Pindaan Kepada JPB/KM/3430/A (JPB/PM/4503 Pin.1(LB) Untuk Kiraan Penyediaan Kawasan Lapang Bagi Cadangan Mendirikan Satu Blok Pangsapuri 21-Tingkat Kos Sederhana 148 Unit Rumah Kediaman Yang Terdiri Daripada:- A) Jenis A 128 Unit Dgn. Keluasan Lantai (820 Kp) Seunit B) Jenis B 8 Unit Dgn. Keluasan Lantai (1000 Kp) Seunit C) Jenis C 4 Unit Dgn. Keluasan Lantai (1600 Kp) Seunit D) Jenis D 8 Unit Dgn. Keluasan Lantai (1650 Kp) Seunit Dan Kemudahan Masyarakat Ditingkat Bawah:- Dewan, Pejabat Pengurusan, Surau, Kolam Renang, Pencawang TNB, Bilik Rekreasi, Pusat Pungutan Sampah Dan Sebuah Pondok Pengawal, Di Atas No. Lot PT 2766 Dan Sebahagian Lot 2916, Lengkok Nipah 3, Mukim 13, Daerah Timur Laut, Pulau Pinang oleh Untuk Tetuan PDC Properties Sdn. Bhd. di Majlis Perbandaran Pulau Pinang

 
March 6, 2010 at 7:29 PMGreg

Why waste $ on swimming pool, rather urge PDC to utilize the swimming pool space to build more additional car parks. Better still, multi storey car park. Believe both PDC and Buyers will be benefited. PDC also can earn extra income.

All buyers should push PDC for taking initiative and find way to build more car park rather than anything else.

 
March 7, 2010 at 5:53 PMMichael

BECAUSE OF THIS "APARTMENT WITH CONDO DESIGN" SO PDC WILL ADD ON SWIMMING POOL & CAR PARK AS WELL.
THIS WILL INCREASE PROPERTY VOLUME THEN THE RESIDENT OF IXORA HEIGHT WILL BENEFIT IT AFTER OC OBTAIN.
BUT HOW ABOUT PDC WILL INCREASE MAINTENANCE FEE???

 
March 8, 2010 at 8:21 AMJack

Isn't it true? add on swimming pool?
just wondering where they going to place it?

Perawit, can you share with us the links from EPBT? thanks

 
March 8, 2010 at 2:05 PMCN YEONG

Find it here:
http://www.epbt.gov.my/osc/Proj1_Info.cfm?Name=103616&S=S

 
March 9, 2010 at 2:43 PMMus

If Ixora will be having swimming pool.. will the maintenance fee be increased? and do they breach the contract? do we need to revise our S&P agreement with the lawyer?

 
March 9, 2010 at 2:54 PMMus

The swimming pool things is all rumours, I just called the PDC Properties for the confirmation, and they said the project is almost done and there is no ammendment for the project

 
March 26, 2010 at 4:32 PMPalymra

Wow...RM150/month for a car park...new benchmark...

 
March 28, 2010 at 6:56 AMGreg

Maybe Michael think Ixora Height is the same standard condo like Silverton at Gurney. Charging premium rate. If one can afford RM150/month for a car park plus paying in addition to the maintenance fee with total fix monthly payment of RM300+/month, maybe he /she can stay in better condo than Ixora Height

 
April 3, 2010 at 5:32 PMMichael

Just do a market search on this area regarding RENTED COVERED CAR PARK as below:-
Taman Jubilee Apartment = RM. 100.00,
Bukit Gambier Height = RM. 100.00,
Desa Airmas Condo = RM. 130.00.
D'Piazza Condo = RM. 130.00

With this chart, i think RM. 150.00 still resonable due to short of car parking bay compare with your luxury car like Mercedes Benz, Nissan Murano, Audi A4, Toyota Camry, Honda Stream RSZ & Honda Odyssey. THINK ABOUT IT???

 
April 3, 2010 at 8:00 PMPalymra

Hi Michael,
Can you share with us how you do market research about COVERED CAR PARK rental rate?

I also rent out a car park at that area, I charge RM80/month. Is it mean my rental rate is too low?

 
April 3, 2010 at 10:08 PMGreg

Michael,
My cousin was staying opposite Ixora Heights for more than 8 years. He also rented a car park for almost the same period and the rental currently is RM60.00, though not covered. Not sure if price difference between COVERED AND NOT COVERED worth an extra RM90?

 
April 5, 2010 at 5:22 PMCN YEONG

I stay in Tmn Jublee Phase 5 Block 27, I rent an additional car park for just RM 60 per months. RM 150 for Ixora Height? Are you trying to kidding me?

 
April 6, 2010 at 12:52 PMUnknown

I stay in Taman Jubilee Phase 5 block 27, I rent additional car park for just RM 20 per months. RM 150 for Ixora Height? Are you trying to kidding me?

 
April 6, 2010 at 3:27 PMCN YEONG

Rm 20 per month? are you sure?

 
April 7, 2010 at 5:04 PMUnknown

Hi All,

If you plan to install smart switches (control lighting/ fan/ autogate, etc) with remote control or computer control.

Kindly email Ms. Jenny at jenny@newict.com or call 04-6429697. You are welcome to visit Newict website at www.newict.com for furtehr info.

We have our authorised dealer to install and support you.

Thank You.

 
April 10, 2010 at 2:27 PMUnknown

Hi all,i hv an offer for this apartment,as the OC is yet to obtain is there any risk if buy from sub sale market? any one could advise?

Rgds

 
April 15, 2010 at 12:52 PMsy

recently just received PDC letter that my unit only completed 70%. still have balance 30%...

 
April 18, 2010 at 8:44 AMWebster

I rent car park for 60 in jubilee. from apartmanagement some more. hopefully people don't simply gorent the price and make it inflated unnecessarily else I can't afford anymore. maybe in order to really prove, one must include official reciept.

 
April 24, 2010 at 2:38 PMIvyChew

i lookin for Ixora Height with 1090 sq..may u know wat is de price

 
May 4, 2010 at 5:39 PMS

Hi,

May i know that how much will the maintenance fees be?

just plan to buy house. miss out all the recent project launching. any1 have suggestion for me if compare Dpiazza with Ixora?

Thanks

 
May 16, 2010 at 12:19 PMMichael

Anyone know that a location car park for owner have been fix by PDCP ?
Tower crane already moving out from the site, construction road kerb at inside & outside driveway on progress.

 
May 26, 2010 at 10:26 AMCN YEONG

I just checked with PDC.. according to them the completion of IXORA will be at the end of the year and OC somewhere next year.

 
May 28, 2010 at 11:51 AMUnknown

Do anyone know beside ixora height new low cost units sharing the same in-out road ? or PDC will open another road for them ?

 
June 6, 2010 at 12:43 AMGreg

Progress of this project is extremely slow. Typical semi-govt project. Vista Gambier and Ixora started piling almost the same time. Vista Gambier oredi obtained OC, Ixora still yet complete its car park and other facilities.

 
June 7, 2010 at 8:19 AMJack

Progress sure extremely slow because the worker rest/chat more than working. You can see them always sit at trash area.

are they purposely to delay the construction? or short of worker because Halaman Kenanga?

 
June 7, 2010 at 11:07 AMUnknown

haha...looks like owners starting to sell at crazy price already...

 
June 12, 2010 at 2:44 PMGreg

PDC still can't curb its image and culture as inefficient developer despite changing in govt. Sigh...... not sure how the quality like. From the interior and exterior, still can't see how this apartment really fit the tagline "Apartment with Condo Design". Quality of PDC project still look not as good as project developed by other private developer.

 
June 14, 2010 at 9:11 AMMus

The project expect to complete December 2010, OC June 2011. It is in the plan. According to developer, all high rise building take 3 years to complete. It is mandatory. According to other contractor PDC is very detail to check every single defect in the construction. That is the reason they need to slow down. Safety comes first

 
June 21, 2010 at 3:35 AMGreg

Mus, 3 years is a maximum period developer require to complete the project. Usually won't take that long to complete an apartment, if the developer is efficient. 3 years period just give the developer more breathing time, in case of any unexpected event before the buyer can claim LAD.

 
July 3, 2010 at 1:20 AMUnknown

recently past by the site and notice that most of the view is seeing to cemetery.not a major concern if you don mind the cemetery view.
the major problem traffic.It is very congested there.

 
July 3, 2010 at 12:04 PMImTyanz

Hi All,

What is the current price for sq ft ranging 960-1090? Planning to get 1 unit.

 
August 1, 2010 at 1:52 AMGreg

Ixora Heights in Facebook.

http://www.facebook.com/pages/Ixora-Heights/130264703683983

 
October 8, 2010 at 10:01 PMGreg

Great Amenities With Enhanced Security
======================================
- Gate-post with 24 hour security
- Card access system

No CCTV, no card access for lift like BL Avenue and The Spring, chicken wire fence and PDC called these Enhanced Security.

PDC misled the buyers, Card access system above refers to 'touch n go' card, not card access to the lift or lobby and Gate-post is actually the same thing.

Typical low quality govt project and named it as Condo-like? PDC shortchange the buyers.

 
October 10, 2010 at 12:58 PMWill.Iam

Stanley, "chicken wire fence" Pl take some pictures to validate what you say or .... u hd selected the wrong property to make yr comments.

 
October 10, 2010 at 6:30 PMGreg

owner,
Don't be lazy, want to know, go to the site and witness the stretch of green colour chicken wire fence yourself. You won't miss it. Then only start accusing the comment is inaccurate or wrong property.

 
October 13, 2010 at 7:18 PMWill.Iam

stanley, "wrong property" I pass that place almost ev-day. my fren just uploaded some pictures. The wall looks presentable.

 
October 14, 2010 at 3:53 PMWill.Iam

Stanley, U r right ... that lazy owner only look @ one side of the property. I guess he missed out the high end chicken fence. LOL

 
October 14, 2010 at 11:53 PMUnknown

The green chicken fence is actually near to children's playground beside reflexology track.
Property Without full Facilities yet the price shoot up to RM320-330.it's a good buy?

 
November 6, 2010 at 1:19 PMLi

The master bedroom is REALLY, REALLY SMALL. One bed and cupboard each left little walking space. 3 cut-in corners make renovation difficult.

 
November 9, 2010 at 10:48 PMteQuiLa_poP

when the OC can be obtained?
can go inside to view the house now?

 
November 11, 2010 at 11:28 PMMichael

OC estimate B4 Chinese New Year 2011, because delay of re-surfacing Main Road & Existing Road and also new traffic light wiil be install at junction.

 
November 11, 2010 at 11:31 PMGreg

richard,
The only possibility u can get this price is from bumi-buyer even if u r lucky enough.

 
November 12, 2010 at 9:57 AMrichard

Suki,

Do u have any bumi buyer to recommend, will i face any problem if buy from them.

 
November 12, 2010 at 10:07 PMrichard

Pick form Penang Comment

(The recent BN ruling is very good. So speculators who have yet to obtain their EF. High time now to consider dropping the units as hv to fork out 30% down now. Allow those genuine homeowner a chance to own their dream home)

 
November 17, 2010 at 10:43 AMsy

look like no light at cover parking

 
November 21, 2010 at 8:24 PMGreg

Gather buyers to lodge complaint to PDC Properties. They are doing a lousy job.
- No CCTV
- No light at Car Park
- No card access to lift
- No foot reflextology track
- Bad Guard House design, should built wider window.

 
November 21, 2010 at 8:35 PMGreg

Can also lodge complaint to CM Lim Guan Eng who is also PDC Chief. Even low cost flat also have CCTV, is PDC trying to cut-corner in this project?

 
November 22, 2010 at 4:29 PMrichard

Some more overpricing

 
November 27, 2010 at 5:24 PMGreg

Actually, there might not be Penang Bridge View, that's the reason why in original PDC's project plan, just named it as Facing Penang Bridge. Both obviously contain 2 different meaning.

 
November 29, 2010 at 9:40 AMCN YEONG

Project estimated complete by end of this year. OC around mid of next year.

 
December 2, 2010 at 1:04 PMsy

just confirm with PDC that said the cover packing have the light.....

 
December 3, 2010 at 10:31 PMMichael

Hi SY,
R U sure this car park lighting will be install, when? How about CCTV??? Please advice, Tqs

 
December 3, 2010 at 11:45 PMGreg

SY is right about the car park lighting.

 
December 28, 2010 at 1:13 PMMus

Just call PDC this morning..they said Ixora expect to complete by year end, and OC expected on August 2011.. why so long... I think it's all bullshit..coz I asked them b4.. they said during 1st quarter 2011... WTF..

 
December 28, 2010 at 9:48 PMmichael

Hi Mus,
No choice, but just need to wait as dateline is 3 years start from your S&P (Aug 2011).
To be honest, don't ask those salesgirl because they know nothing. waste time & money to call them.

 
December 28, 2010 at 10:15 PMrichard

They already complete every thing why should wait for full 3 years, is this the procedure devaloper must follow. Thank.

 
December 28, 2010 at 11:41 PMGreg

PDC still fail to shred away their inefficient and lazy mentality. They are very famous with their delay trademark. Look at Bayan Mall (now known as Queensbay Mall) How many years have they delay until need to be taken over by other developer.

Even S&P signing for Ixora Heights also delayed for few years. Everything delays.

Look at Ixora, despite completed still fail to lit up the apartment/car park and etc.

Buyers may lodge complaint to the following key persons in PDC:

Chief Minister of Penang
YAB Tuan Lim Guan Eng (email: limguaneng@penang.gov.my)

PDC Properties (Chairman)
Dato Rosli Jaafar (email: rj@pdc.gov.my)

PDC Properties (email: marketing@pdcp.com.my)

 
December 28, 2010 at 11:50 PMGreg

They have failed their Mission Statement and Goals miserably.


PDC Properties
==============

Mission Statement
-----------------
To be a premier provider of quality, affordable homes by:

creating value for our buyers through relevance, practically, reliability, sustainability and design excellence
consistently improving our performance to deliver the highest quality products and services,
being true and fair in our dealings with all buyers, vendors, employees and partners


Goals
-----
We will continuously focus on building a reputation for delivering reliable and premium products.
We strive to deliver quality residential and commercial properties built upon our integrity and commitment towards customer’s satisfaction.

 
January 8, 2011 at 8:47 PMdion

randy is your not satisfied or fed up just sell ur unit,do not make bull shit at this blog.

 
January 10, 2011 at 2:04 AMGreg

Smart Axx dion, which point is bullshit? whether i sell my unit or not, is it ur business?

 
January 11, 2011 at 8:46 AMMus

Don't be so emotional in this blog, what Randy said is real and proven. The S&P was delayed for 2 years, the project started late, and the OC also late. Go and ask PDC why all these things could happenED?

 
January 11, 2011 at 10:36 PMdion

hello,yeah not my business.i just suggest 2 u only.next we hope get a nice neighbour living at ixora.oo yes,i already get information from contractor at site,oc not late because s&p expired on august according first aggrement wth pdc.

 
January 15, 2011 at 3:25 PMGreg

It may not be relevant with whether SNP expired or not. It's about attitude and lazy culture of the organization/company. It's about efficiency.

Just like when an organization has the ability to complete a task in one week time but they tend to drag their feet upto one year and do nothing during that period. Take their own sweet time becos there is no KPI for them to meet.

Vast different from privately owned developer.
Very clear examples are Vista Gambier, Summer Place.

Summer Place open for sales at least a year later than Ixora. Have over 500 units, bigger scale, more facilities than Ixora. But what is the status now between Summer Place and Ixora.

Judge by yourself. Shameful PDC Properties.

Actually, I'm not the owner of Ixora myself, but my cousin did, he bought the unit many years ago due to wanna get marry,but have to drag his wed for years becos of this lazy and inefficient developer, delay signing SNP and drag the completion of the project.

I don't think the project manager/contractor of Ixora can survive their job if they are employed in privately owned company rather than PDC.

That one really pissed me off.:(

 
January 16, 2011 at 12:41 AMMus

It's true Randy, I think Dion is still freshie in this property world..PDC was well known for its lousy job..I had no other option except to buy Ixora.. Ixora is cheaper than other properties during my time..if I found out another apartment which offer similar or better than Ixora, definitely I'll buy it.

 
January 16, 2011 at 10:00 AMJack

Randy, i aslo one of the victim. need to pay rental for other people property in the same time pay ixora installment, and wedding also need to wait...
Isn't it so difficult to get OC done?

Hope anyone from PDC saw our comments here and please make it done as soon as possible. PDC really pissed the owner off. Don't waste other people time.

 
January 19, 2011 at 10:26 PMsy

just get the info from security guy that said got CCTV, the 2 lift function will seperate to 1 lift can up from 1 to 10 floor only and the second lift will start from 11 to 20 floor. motorcycle parking area got cover parking

 
January 21, 2011 at 7:01 PMsy

just FYI, PDC start to install the car pack light

 
January 23, 2011 at 4:47 PMCabai Perawit

good to hear that...got light at car park and 1 lift will serve different levels. at least we wouldnt facing problem at morning and evening, everyday during workdays. hopefully....

 
January 23, 2011 at 6:41 PMGreg

The lift arrangement is not practical. My in law stays in mid lower floor while I'm at high floor. Everytime we need to visit each other need to go all the way down to change lift? Sound crazy. Also, PDC assumes residents between lower and upper should not mix with each other? What a crazy idea. This is only practical when you have more than 2 lifts, like some office blocks.

 
January 23, 2011 at 6:45 PMGreg

Very damn incovenient. Can PDC think of a better option?

 
January 23, 2011 at 8:22 PMmichael

whose clever idea 2 lifts serve different floor?
if 1 lift breakdown, then we need to walk stair already. correct me if i wrong.

 
January 24, 2011 at 10:16 AMMus

Its true.. But for me its just ok.. coz my unit is in 11th floor..
last night I visited Ixora and speak the guard there.. he said the OC will be given once the road is built...hurmm..when huh?

 
January 25, 2011 at 3:13 PMsy

The lift can be control by security guard. if 1 lift breakdown. security guard can switch the other 1 lift to all floor. this is what I know.

 
January 25, 2011 at 9:54 PMGreg

sy,keep your finger cross for CCTV to install. don't really trust the guard or even pdc staff until you see CCTV install with your own eyes. Last time pdc staff also told me go to lift need access card. But seems all mere talking.

But I also do hope the guard is telling the truth though very little hope.

 
January 27, 2011 at 2:40 PMMichael

Hi ROOKIE, yes i agree what you saided is right.
I don't thing PDCP will install CCTV on this moment. Is better to speed up to resurface existing main road & new traffic light at junction as agree by JKR. PLEASE HURRY UP YOUR UN-COMPLETED WORK TO APPLY OC OBTAIN. OK

 
January 27, 2011 at 2:51 PMMichael

I also talk to 2 Pak Guard they, theys are don't know nothing about this project history & happening.
PDCP should built motorcycle touch n go boomgate to avoid unneccesery guy into IXORA HEIGHT. I strongly support this mention to be built ASAP. How u guy opinion on this thing???

 
February 5, 2011 at 9:03 PMGreg

Anyone notice all windows at the middle staircase are without cover / glass, and some more the windows are also very near the window of the 2nd room. Very easy for uninvited guests to climb over and get in the room thru the room's window since the staircase is a public place can be accessed by anyone.

What PDC is trying to do? cut cost? encourage burglary ? Outrageous!

 
February 8, 2011 at 9:05 AMMus

Yes Rookie its true.. I visited the unit a few month back.. I also talk to my friend about this matter.. hope PDC will do something lor

 
February 9, 2011 at 12:44 AMGreg

Hope it's not another sub-standard project which shortchanged the buyers due to unscrupulous dealing with the contractors, which result in cutting corner.

The window is clearly big enough for someone to simply climb over to the room.

For the lift arrangement, instead of one lift from 1-10 & another lift from 11-20. Why not make it an Even number floor for one lift and an Odd number floor for another.

In case any one lift breakdown, at least the residents need not climb so many floor.

 
February 18, 2011 at 12:24 PMWill.Iam

heard that OC is obtained but somehow PDC is holding it until June for whatever reason.
Perhaps our dear Tuan Chairman can explain ... I sympathize those who have to pay their rents & installments while waiting for PDC...

 
February 27, 2011 at 11:25 AMJewel Click

surrounded by low cost apartments, lack of basic facilities, congested, i would said this is now over-price... only families staying at the same area would buy it.

 
March 5, 2011 at 8:58 AMmichael

Hello,
any update about OC? or any latest picture can share? i fail to get inside. :( thanks

 
March 17, 2011 at 11:01 AMMus

Call PDC this morning asking about OC.. still get the same answer.. oc will be available in June or no later than August

 
March 18, 2011 at 6:27 AMsy

received the letter from PDC. the completion only 80%.. still have 20% balance

 
March 19, 2011 at 12:52 AMGreg

sy, next stage will be VP. It shud be within weeks if PDCP is efficient enough.

 
March 25, 2011 at 1:38 AMMichael

PDCP look like "Perlahan Perlahan Sampai" atitude,
I don't thing next week will get VP. if can get 1 month from now 24/3/2011 pun sudah BOOOOOLeh.

 
March 27, 2011 at 10:23 PMGreg

Hope PDCP not cutting corner and shortchanged Ixora Heights buyers to offset a Deluxe Unit given free to Datuk Nicol David worth RM360K during BN time.

 
April 3, 2011 at 1:43 PMUnknown

Hi, I used to be interested to buy a unit but not until I saw the house with my own eyes! The pentagon shape master bedroom is so small with a huge cross beam on the ceiling! You can either put a bed frame OR a wardrobe! Is this how you call a master bedroom? The kitchen is facing the other 2bedrooms! The whole house is full with angles! I'm sure nobody would buy if they see the house first! I'm lucky that I did not make any purchase. If you don't trust what I'm saying here, then you shall wait till you see it for yourself. So not worth the high price as it's now over priced!

 
April 4, 2011 at 1:42 AMGreg

lim,
pls tell smething new, why telling grand old story? the layout oredi posted in this page long long time ago, and the design at least available not less than 3 years, unless u r just born yesterday. U sound like Ixora Heights just built yesterday. Where got whole house full of angles, only the master bedroom shape only, either u r looking at the wrong apartment or just try out ur luck here.

 
April 4, 2011 at 9:38 AMMus

Totally agree with Lim...
luckily Ixora doesn't has a sample house..if so.. I don't think the price will be high....
For me, I just bought it becoz it just close to my office...that's it..nothing much..Believe me the actually house is really small..
Not suitable for big family..just enuf for couple and 2 child to live in it..

p/s I had sneaked in twice..really frustrated with the actually unit

 
April 19, 2011 at 10:11 AMCN YEONG

The road serving the apartment has no progress since 6 months ago. Not sure what PDC is waiting for..

 
April 22, 2011 at 6:24 PMsy

waiting until Jun

 
April 23, 2011 at 7:16 PMMus

haha some of the contractor went to Halaman Kenangan to finish the work there..it seems PDC want to cater both 2 apartments.. mayb OC on both apartment on june..hurmmmmmm just waittt what to do

 
April 24, 2011 at 4:27 PMJack

this is what we have for government firm service, slow and slow and slow... just let people waiting for no reason...

very feel bore on this service level.

 
May 3, 2011 at 10:44 AMCN YEONG

Hi Awie,
Send your letter of concern to Lim Guan Eng(limguaneng@penang.gov.my) directly. Include the reply from the so call marketing as well.
They are not answer your question actually.

 
May 4, 2011 at 3:11 PMteQuiLa_poP

Thanks Awie for bringing out our concerns to PDC.
I think security access card and CCTV is a MUST nowaday due to the high crime rate. Hopefully PDC will look into it seriously.

 
May 4, 2011 at 11:03 PMGreg

I think whoever IH owners have interest in this project should make an effort to write to PDCP, including CM himself to voice out your dissatisfaction and concern. My lone voice is never enough.

I've done my part and will consider to take further action if necessary. But I hope those who give comments in this forum will also doing your part, don't just provide lip service without any action, pls write to the concern parties in PDCP about your dissatisfaction and etc., if you really hope PDCP will seriously look into those highlighted issues. No free lunch in this world.

The necessary info including email addresses of PDCP readily available here.

 
May 9, 2011 at 7:00 PMWill.Iam

I hd written to CM abt this matter but I doubt his assistant had passed the msg to him. Just hope it's not going to be like those old days VIP.

 
May 12, 2011 at 2:06 PMMichael

DELAY, COS DELAYING..... AGAIN..........
WE WILL GET COMPENSATION DUE TO PENALTY BY DEVELOPER AS BELOW FORMULA:

TOTAL SUM RELEASED BY BANK X 10% / 365 DAY.

EVERY PURCHASER SHOULD GROUP TOGETHER FOR '1 HATI 1 MONEY COMPENSATION'.

 
May 12, 2011 at 11:15 PMGreg

Will.Iam,
The only way hang boleh dapat attention is to email PDCP and cc Dato Rosli (PDCP Chairman) and CM.

Michael,
The project may not be delay, as per PDCP, they will handover to the buyer tepat 3 years after S&P signing. To PDCP, this is a big achievement. other issues, cam lacking of security features, CCTV/lift access card dll that cause concern to this project, they don't care much.

 
May 23, 2011 at 5:06 PMMus

I just called them last week, they said waiting approval from JKR..I asked bout the handover they said it's on August.. I queried bout their promise to handover during June....and they queried me back who give that info.. I said I called them few months b4, that was the answer.. then they quiet..FYI what they put in the brochure b4 we sign S&P, the project is ready on December 2010, and the OC will be on the 1st Quarter of 2011..and the latest during by Mid of 2011...

 